From: Brentley C. Stratton Sent: Friday, March 04, 2005 4:48 PM To: Michael C. Zarnstorff; Paul J. Fogarty; Mike Cole; Wayne T. Reiersen; Steve Raftopoulos; Arthur W. Brooks; James H. Chrzanowski; David E. Williamson; fsanders@wisc.edu; Phil Heitzenroeder; Hutch Neilson Subject: Near-term TRC plan based on today's meeting Folks, Thank you for a good meeting today. Based on our discussion, my understanding of the near-term plan for the TRC is: 1. This weekend: finish preparations for winding side A, i. e., complete setting side clamps and set the leads. 2. First shift Monday: wind turn 1 of side A and then stop. 3. Monday as soon as turn 1 is done: measure turn 1 of side A. 4. Monday: adjust clamps on side B while measuring with the Romer arm to attempt to achieve the desired dimensions of the conductor pack. Re-measure side B winding pack when done. No winding of side A will take place while this is happening. 5. First shift Tuesday and beyond: continue winding side A. Stop for measurements of winding pack after turns 5 and 10 are done. Brent