Summary of NCSX
System Integration Team (SIT) Meeting of Monday, May 8,
2006
1. Management items
- Discussed recent visits by
Orbach and Decker.
- PPPL Annual safety forum is
Monday, May 15, 8:30-12:00N
2. Risks
- Readiness for Stage 1 Field
Period Assembly
- VVSA #1 is due to arrive
May 9.
- Main readiness issue is
completing documentation (receipt inspection and FPA #1 assembly procedures)
and ACC review. Latter is scheduled for May 16.
- First activities are
metrology, saddle loop installation. All materials are available for these.
- Assembly drawings
documenting quantities of parts have not been issued, but parts procurements
are not being held up.
- Modular coil design
deliverables.
- Type A drawings are
issued. Type B drawings are ~80% complete. We are ahead of the wave, at
last.
- Type A prosthetic piece
is on order but deliver schedule is tight.
- Shear pin design will be
tested in the next few days.
- C1 cold
testing.
- Strain gauge locations
have been established.
- We need to track this
closely to ensure testing gets completed by June
9.
- Final
assembly
- Romer arm measurements of
the VVSA #1 end flange should be made at
PPPL.
3. Project Control
(Ron)
- April cost-performance data
is in the process of being collected.
4. Next SIT Meeting:
May 22, 2006