The following list
represents prototyping efforts needed.
In all cases the
number represents weeks for 2.5 men (=5 man weeks) and the
status
STATION
1
diagnostic loop
templates 3
complete
cooling tube
layout
2 complete
diagnostic loop
installation 1 complete
cooling tube
clamps
3 60%
cooling tube
risers
1 20%
Coil
interferences C-C 1
100%
Coil
interferences C-B 1
50%
Coil
interferences B-A 1
Coil
interferences A-A 1
Flange
Alignment
3
60%
Bolt
torqueing 2
20%
fiducial
types
1
Bolt shim "grinding"
1
Shear strength
(coating?) 2 Geoff (~50%)
nose
shim
2
bushing
2
epoxy
squirt
3
40 degree
stand
1
STATION
3
vessel fixturing adjustments
1
new
actuators
1
vertical flange
joint
2
lower
supports
1
STATION
4
fiducial
locations
1
port
extension support 1
port extension alignment
1
STATION
5
fixturing
adjustments
1
fiducial
locations
1
clamp
adjustments
1