From: Hutch Neilson
Sent: Thursday, March 22, 2007 4:42 
PM
To: Wayne T. Reiersen; Bradley E. Nelson; Mike 
Cole
Subject: Re: Meeting on NCSX Coil Services, Thurs. 3/22 
@1:30
Wayne, Brad, and 
Mike:
 Summary of Meeting on NCSX Coil Services, 
3/22/07
1.  Electrical leads
  - Fogarty’s drawing of the 
  lugs and the clamp that supports the twisted hex-bundle off the MC shell 
  appears to be a reasonable basis for costing purposes. 
  
- Scope of the MIE 
  project:
 
    - Design of the full 
    upgrade system 
    
- Implementation of all 
    leads from the terminals to an accessible point outside the MC shell. 
    
    
- From that point to the 
    outside world, implement only what is required for the CD-4 
    configuration.
 
 
- P. Goranson is the job 
  manager, responsible for generating the estimate for the ETC update. 
   Initial input is due April 2. 
  
- P. Fogarty will provide 
  design support.
 
2.  LN2 distribution system
  - Goranson’s drawing appears 
  to be headed in the right direction. A schematic is needed that shows the 
  parts count and shows where the hard tubing ends and flexible stainless hose 
  begins. Requested modifications:
 
    - System is closed loop. 
    
    
- No flow meters. 
    
    
- Consider using an orifice 
    solution instead of flow control valves. 
    
- Consider one header per 
    half period.
 
 
- P. Goranson is the job 
  manager, responsible for generating the estimate for the ETC update. 
   Initial input is due April 2. 
  
- G. Gettelfinger is 
  responsible for setting the functional requirements for the 
  system.
 
This is what I remembered. Please let me know if 
there are any corrections or additions.
Thanks.
on 3/20/07 
5:10 PM, Hutch Neilson  wrote:
Folks,
The 
  next meeting on NCSX coil services is scheduled for Thursday, March 22 at 1:30 
  p.m. in the Engineering Conference Room. Most of the concerned parties will be 
  at PPPL that day. For those participating remotely, please dial in as 
  follows.
  USA Toll Free 
    Number: 1-866-830-3841
PARTICIPANT PASSCODE: 6848450# 
  
Slides will be shared using 
  NetMeeting.
Proposed Agenda:
  
    - LN2 distribution 
    architecture / schematic  (P. Goranson) 
    
- Electrical leads 
    architecture /schematic  (t.b.d.) 
    
- Update on cost items. 
     (New information from any and all) 
    
- Path forward on coming up 
    with an estimate  (Brad)
 
Hutch