From: Thomas G. Brown
Sent: Tuesday, September 07, 2004 4:56 PM
To: Bob Simmons
Cc: 'Cole, Michael J.'; Phil Heitzenroeder; Wayne T. Reiersen
Subject: RE: ECP-014 CD-3 Rebaselining

Bob,

 

Mike Cole forwarded your email to me regarding the posting of ECP-014.  One area in the cost reduction resulted in the elimination of the NBI port extension. I’m not sure if Bill Blanchard has commented on this proposal or not (he’s on vacation until September 13th).  Last year he looked at the vertical ports and the large horizontal diagnostic port to meet his pumping requirements but found them to be conductance limited.  We developed a simplified NBI port pumping duct arrangement that could be fabricated at a lower cost than estimated for the NBI port extension.  The comparison of the duct arrangement can be seen in the attachment.  Mike and I have a concern that although the elimination of the NBI port is a cost savings, the addition of a pumping port is not a “0” cost item.  The pumps must be located in a low field area which adds distance between the VV opening and the location of the pumps.  Diagnostic openings also will be desired (as shown in the ppt file). Has the cost of the pump ducts been accounted for?

 

-Tom

 

-----Original Message-----
From: Cole, Michael J. [mailto:colemj@ornl.gov]
Sent: Tuesday, September 07, 2004 2:38 PM
To: Thomas G. Brown
Subject: FW: ECP-014 CD-3 Rebaselining

 

 

 

-----Original Message-----
From: Bob Simmons [mailto:bsimmons@pppl.gov]
Sent: Tuesday, September 07, 2004 12:57 PM
To: James H. Chrzanowski; Michael E. Viola; Phil Heitzenroeder; Goranson, Paul L.; Williamson, David E.; Cole, Michael J.; Timothy N. Stevenson; rramakrishnan@pppl.gov; Gary E. Oliaro; Geoffrey J. Gettelfinger; Michael R. Kalish; Zarnstorff_Mike; Nelson, Brad E.; Alfred von Halle; Lawrence E. Dudek; Neilson_Hutch; Charles A. Gentile; Wayne T. Reiersen; Ronald L. Strykowsky; Frank A. Malinowski; Judith A. Malsbury; Jerry D. Levine
Cc: Marianne Tyrrell
Subject: ECP-014 CD-3 Rebaselining

 

Folks,

 

I have posted a partial ECP-014 (CD-3 Rebaselining) on the NCSX Engineering Web at:  <  http://ncsx.pppl.gov/SystemsEngineering/Config_Mgmt/FY2004_ECPs/FY2004_ECPs_index.htm> for your review and comment.  The missing attachments (primarily items that involve Ron and I) will be posted later this week.

 

Please provide your comments back to me by the end of this week (Friday, September 10th).  I would like to hold a CCB early next week if at all possible.  Due to my TOFE travel, I would propose a CCB at 11:00 am on Monday, September 13th.  We will hold the CCB in the NCSX Engineering Conference Room and will connect with ORNL using Net Meeting.

 

Marianne – please schedule the conference room for next Monday.

 

Finally, please note that we have dropped the FY designation from the ECP numbering scheme – this and future ECPs will be sequential in number.

 

Thanks,

 

Bob S.

 

Bob Simmons

NCSX Systems Engineering Support Manager

Princeton Plasma Physics Laboratory (PPPL)

Tel #: (609) 243-2766

Fax #: (609) 243-3030