NCSX Web Pages  

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Change Control > ECP Status List
   
 ECP Forms
   
ECP Number ECN? RFD? Title Date Approved or Disapproved Impacted WBS Elements Type of Impact (Tech, Cost, or Schedule)
             
040     Updated of Modular Coil SRD 12/2/2005 14 Technical
039     PMB Update 11/9/2005 12, 13, 14, 17, 18, 3, 4, 7, 8 Cost & Schedule
038 5016

5026

14-005, 14-006, 14-008, 14-009R1 MCWF Technical Requirements Update 11/3/2005 13 Technical
037     Revision 3 to the GRD 9/9/2005 13, 14, & 4 Technical
036     Risk Retirement, Budget Reallocation, Correction of Data Error,  and New Work 8/9/2005 12, 14, & 19 Cost & Schedule
035 X   Changes to MCWF Technical Requirements 8/5/2005 14 Technical
034     Vacuum Vessel Trinos Flanges 7/11/2005 12 Cost
033-R1 X X Revision 1 to MCWF Technical Reqmts 7/19/2005 14 Technical & Cost
032   X RFD-14-006 - permit 2.5" and 3.5" pipe to be manufactured from ASTM 625 plate 5/27/2005 12 Technical
031     DOE Directed Rebaseline 8/10/2005 All Cost & Schedule
030     Planning Changes for Risk Management 5/4/2005 All Technical, Cost, & Schedule
029     Retirement of Risks for VVSA Forming Dies and Twisted Racetrack Assembly 4/21/2005 12 & 14 Cost
028   X RFD-14-001 - Relocation of Pattern/Casting ID Number 3/30/2005 14 Technical
027 X X RFD-12-002R1 - Substitution of Sch10 Pipe for Sch40 Pipe for the 2.5" Pipe 3/24/2005 12 Technical
026 X   MCWF Fast Response 3/14/2005 141 Technical
025   X RFD-12-001 - Manufacture of the 6", 8" and 10" Pipe from ASTM 625 Plate 3/10/2005 12 Technical
024     Miscellaneous Rescheduling and Contingency Draw for Added and Re-Estimated Scope 3/7/2005 12, 13, 81 & 82 Technical, Cost, & Schedule
023     MCWF Minimum Mechanical Properties 2/17/2005 141 Technical
022 R1 X

Y

  TRC Design Updates R1 - 2/3/2005 142 Technical, Cost, & Schedule
021     Job Close-Out & Contingency Drawdown 1/31/2005

12, 141, 142, & 84

Cost & Schedule
020 X   Resolution of MCWF Questions (Dec-2004) 1/14/2005

141

Technical
019 X

Y

  VVSA Contract Addenda 3-1 though 3-3 1/25/2005

121

Technical
018     FY005 Replanning Baseline 11/19/2004 12, 14, 15, 18, 19, 3, 4, 5, & 7 Technical, Cost, & Schedule
017R1 X   VVSA Inner Support Bosses 11/9/2004 121 Technical
016R1     Reprogramming for FY2004 Closeout 11/9/2004 121, 133, 141, 142, 144, 19, 21, 432, 612, 614, & 82 Technical, Cost, & Schedule
015 X   Final Technical Scope of MCWF 9/17/2004 141 Technical
014     CD-3 Replanning 9/20/2004 12, 14, 187, 25, 3, 4, 5, 62, 64, 81, 82, 84, & 85 Technical, Cost, & Schedule
013 X   Modifications to VV Joint R&D Seals and End Pieces 7/30/2004 121 Technical &  Cost
012 X   MCWF Lead Block and Support Modifications 7/30/2004 141 Technical
011     Rebaseline for Modular Coil WAFs 7/28//2004 14 Cost & Schedule
010 X   Prototype Winding Form Poloidal Break Geometry 6/28//2004 141 Technical
009     Reprogramming 7/8/2004 141, 142, & 185 Technical, Cost, & Schedule
008     Update of the Technical Baseine to Reflect the VVSA and MCWF FDR Design Configuration 6/23/2004 121, 141, & 185 Technical, Cost, & Schedule
007 X   Twisted Racetrack VPI Groove Depth 4/28/2004 141 Technical
006     Updated Cost and Schedule Estimate for Design and R&D 4/29/2004 121, 13, 141, 144, & 144 Technical, Cost, & Schedule
005     Revised Estimates fro Design, R&D, and Tooling 3/15/2004 12, 14, 18, 2, 3, 4, 5, 6, 7, & 8 Technical, Cost, & Schedule
004     CD-2 Cost and Schedule Baseline 2/28//2004 12, 14, 16, 18, 2, 3, 4, 5, 6, 7, & 8 Technical, Cost, & Schedule
003     FY2004 Management Reserve Distributions 1/20/2004 Various WBS Elements Cost
002     Change in MCWF Design 11/18/2003 141 Technical
001     Revision 1 to the General Requirements Document 1/23/2004 1, 2, 3, 4, 5, 6, & 7 Technical

 

Privacy and Security Notice

Please forward comments and questions to the bsimmons@pppl.gov