Engineering > Configuration Control > RFDs > WBS 18
   
RFD Number Associated ECP Number Title Date Approved or Disapproved RFD Status
         
WBS 18 Requests for Deviation    
18-001   RFD-18-001,  Change in Welding Requirements (Use either GTAW or GMAW) 12/10/2007 Stamp placed on impacted drawings
18-002   B/C Coil Fit Up Interferences 12-20/2007 Stamp placed on impacted drawings
18-003       NOT YET USED
18-004R1   Change in Welding Requirements 4/22/2008 Stamp placed on impacted  drawings
18-005   Welding Obstruction 5/7/2008 Stamp placed on impacted  drawing

 