------- ---------- ------------- ------------------------ ---------- 0805 mie closeout plan including $9m proposed r&d scope EC31 ECP-31 April05 EC53 ECP-53 last approved baseline change used for CPR reporting ETCL Lehman august 2007 proposed baseline RB08 Lehman April 2008 proposed baseline RBAC Post Lehman April 2008 showing accelerated cryo systems and other design scope ETCU NCSX Upgrades