WBS 1 Stellarator Core Systems
CD-2 Baseline
WBS Level 3 | WBS Level 4 |
WBS 11 - Plasma Facing Components
|
WBS 111- Limiters
WBS 112 - Internal Liner - NOT IN BASELINE
WBS 113 - Internal Trim Coils - NOT IN BASELINE
WBS 114 - Local I&C- NOT IN BASELINE
|
WBS 12
- Vacuum Vessel Systems
|
WBS 121 - Vacuum Vessel Assembly
WBS 122 - Thermal Insulation
WBS 123 - Heating & Cooling Distribution System
WBS 124 - Vacuum Vessel Supports
WBS 125 - Local I&C
|
WBS 13
- Conventional Coil Systems
|
WBS 131- TF Coils
WBS 132 - PF Coils (PF Solenoid & PF Ring Coils) - This now includes the CS Support Structure (transferred from old WBS 152
WBS 133 - External Trim Coils
WBS 134 - Conventional Coils Local I&C
|
WBS 14
- Modular Coils
|
WBS 141 - Winding Forms
WBS 142 - Windings & Assembly
WBS 143 - Local I&C
WBS 144 - Winding Facility & Fixtures
|
WBS 15
- Coil Support Structures
|
WBS 151 - Coil Support Structures (All but Central
Solenoid)
WBS 152 - Central Solenoid Support Structure - relocated to WBS 132 WBS 153 - Local I&C - combined with WBS 151 |
WBS 16
- Coil Services
|
WBS 161 - LN2 Distribution System
WBS 162 - Electrical Leads (Inside Cryostat)
WBS 163 - Coil Protection System
|
WBS 17
- Cryostat and Base Support Structure
|
WBS 171 - Cryostat
WBS 172 - Base Support Structure
|
WBS 18
- Field Period Assembly
|
WBS 181 - Planning & Oversight
WBS 182 - TFTR Test Cell Preparation
WBS 183 - Receipt, Inspection, and Testing of Coils
WBS 184 - Receipt, Inspection, and Testing of Vacuum Vessel
WBS 185 - Field Period Assembly
WBS 186 - Tooling Design and Fabrication
WBS 187 - Measurement Systems
|
WBS 19
- Stellarator Core Systems Management & Integration
|
WBS 191- Stellarator Core Management and Oversight
WBS 192 - Stellarator Core Integration & Global Analysis
|