WBS 1 Stellarator Core Systems
PDR Baseline
WBS Level 3 | WBS Level 4 |
WBS 11 - Plasma Facing Components |
WBS 111- Limiters WBS 112 - Internal Liner - NOT IN BASELINE WBS 113 - Internal Trim Coils - NOT IN BASELINE WBS 114 - Local I&C- NOT IN BASELINE |
WBS 12 - Vacuum Vessel Systems |
WBS 121 - Vacuum Vessel Assembly
WBS 122 - Thermal Insulation WBS 123 - Heating & Cooling Distribution System WBS 124 - Vacuum Vessel Supports WBS 125 - Local I&C |
WBS 13 - Conventional Coil Systems |
WBS 131- TF Coils
WBS 132 - PF Coils (PF Solenoid & PF Ring Coils) WBS 133 - External Trim Coils WBS 134 - Conventional Coils Local I&C |
WBS 14 - Modular Coils |
WBS 141 - Winding Forms
WBS 142 - Windings & Assembly WBS 143 - Local I&C WBS 144 - Winding Facility & Fixtures |
WBS 15 - Coil Support Structures |
WBS 151 - Coil Support Structures (All but Central
Solenoid)
WBS 152 - Central Solenoid Support Structure - Will be moved to WBS Element 132 as part of CD-2 baseline WBS 153 - Local I&C - Will be moved to WBS Element 151 as part of CD-2 baseline |
WBS 16 - Coil Services |
WBS 161 - LN2 Distribution System
WBS 162 - Electrical Leads (Inside Cryostat) WBS 163 - Coil Protection System |
WBS 17 - Cryostat and Base Support Structure |
WBS 171 - Cryostat
WBS 172 - Base Support Structure |
WBS 18 - Field Period Assembly |
WBS 181 - Planning & Oversight
WBS 182 - TFTR Test Cell Preparation WBS 183 - Receipt, Inspection, and Testing of Coils WBS 184 - Receipt, Inspection, and Testing of Vacuum Vessel WBS 185 - Field Period Assembly WBS 186 - Tooling Design and Fabrication WBS 187 - Measurement Systems |
WBS 19 - Stellarator Core Systems Management & Integration |
WBS 191- Stellarator Core Management and Oversight
WBS 192 - Stellarator Core Integration & Global Analysis |