WBS 11: Paul Goranson | WBS 12: Paul Goranson | Date of Agreement: January 9, 2003 |
Project Engineer (s): Brad Nelson (WBS 1) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | (1) Assess impact of incorporating a lithium divertor. |
WBS 11 (Goranson) |
Memo - Project will use as basis for establishing lithium-related performance and interface requirements. | Needs to be done well in advance of when WBS 12 performance specification is due. | |
(2) Assess impact of incorporating a CFC liner with a divertor. |
WBS 11 (Goranson) |
Memo - Project will use as basis for establishing envelope and interface requirements. | Needs to be done well in advance of when WBS 12 performance specification is due. | ||
Functional Interfaces | (1) Bakeout heat loads on the VV and In-Vessel Components. |
WBS 11 (Goranson) |
Maximum heat loads incorporated in WBS 11 and WBS 12 performance specifications. | Needs to be done in advance of [1] when thermal analysis and cooling system is planned and [2] when WBS 12 performance (design-to) spec is due. | |
Physical Interfaces | (1) Physical interface between initial limiter and vacuum vessel. |
WBS 11 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | |
(2) Provisions required in vacuum vessel design to accommodate possible PFC upgrades. |
WBS 11 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |
WBS 11: Paul Goranson | WBS 12: Paul Goranson | Date of Agreement: January 9, 2003 |
Project Engineer (s): Brad Nelson (WBS 1) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Physical Interfaces | (3) Grounding connections between PFCs and vacuum vessel. |
WBS 11 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | |
(4) Provisions required in vacuum vessel design to accommodate internal trim coil upgrade. |
WBS 11 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |