WBS 12:  Paul Goranson WBS 14:  Dave Williamson Date of Agreement:   December 17, 2002
Project Engineer (s):  Brad Nelson (WBS 1) Systems Engineer:  Bob Simmons

Type of Interface

Scope

Lead Responsibility

Deliverable

Due Date

WAF Task Reference

Design Studies None

 

     
Functional Interfaces (1) VV heat loads on the modular coils.

WBS 12 (Goranson)

Maximum heat loads incorporated in WBS 12 and WBS 14 performance specifications Needs to be done in advance of [1] when thermal analysis and cooling system is planned and [2] when WBS 12 & WBS 14 performance (design-to) specs are due.  
Physical Interfaces (1) VV port extension interfaces with modular coils.

WBS 12 (Goranson)

Separate ICD. Needs to be done in time to incorporate into VV & modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR.  
  (2) VV/modular coils assembly orientation and clearances to facilitate assembly of field periods.

WBS 12 (Goranson)

Separate ICD. Needs to be done in time to incorporate into VV & modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR.  
  (3) Physical attachment to modular coil support structure.

WBS 12 (Goranson)

Separate ICD. Needs to be done in time to incorporate into VV associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR.