WBS 12: Paul Goranson | WBS 14: Dave Williamson | Date of Agreement: December 17, 2002 |
Project Engineer (s): Brad Nelson (WBS 1) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | None |
|
|||
Functional Interfaces | (1) VV heat loads on the modular coils. |
WBS 12 (Goranson) |
Maximum heat loads incorporated in WBS 12 and WBS 14 performance specifications | Needs to be done in advance of [1] when thermal analysis and cooling system is planned and [2] when WBS 12 & WBS 14 performance (design-to) specs are due. | |
Physical Interfaces | (1) VV port extension interfaces with modular coils. |
WBS 12 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV & modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | |
(2) VV/modular coils assembly orientation and clearances to facilitate assembly of field periods. |
WBS 12 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV & modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | ||
(3) Physical attachment to modular coil support structure. |
WBS 12 (Goranson) |
Separate ICD. | Needs to be done in time to incorporate into VV associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |