WBS 14: Dave Williamson | WBS 18: Jim Chrzanowski | Date of Agreement: December 17, 2002 |
Project Engineer (s): Brad Nelson (WBS 1) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | None |
|
|||
Functional Interfaces | None |
|
|||
Physical Interfaces | (1) Assembly related attachments, special tooling needs, lifting points, clearance requirements for field period assembly. |
WBS 18 (Chrzanowski) |
Separate ICD. | Needs to be done in time to incorporate into modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | |
(2) Assembly related attachments, special tooling needs, lifting points, clearance requirements, and measurement points for final assembly. |
WBS 18 (Chrzanowski) |
Separate ICD. | Needs to be done in time to incorporate into modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |