WBS 14: Dave Williamson | WBS 4: Raki Ramakrishnan | Date of Agreement: December 17, 2002 |
Project Engineer (s): Brad Nelson (WBS 1) & Larry Dudek (Ancillary Systems) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | None |
|
|||
Functional Interfaces | None |
|
|||
Physical Interfaces | (1) Modular coils grounding connection to NCSX grounding system outside the cryostat. |
WBS 14 (Williamson) |
Separate ICD. | Needs to be done in time to incorporate into modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. | |
(2) Attachment schemes and envelopes between modular coils and electrical leads (WBS 162) and coil protection system interfaces (WBS 163 & WBS 4). |
WBS 14 (Williamson) |
Separate ICD. | Needs to be done in time to incorporate into modular coil design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |