WBS 14: Dave Williamson | WBS 5: Gary Oliaro | Date of Agreement: December 17, 2002 |
Project Engineer (s): Brad Nelson (WBS 1) & Larry Dudek (Ancillary Systems) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | None |
|
|||
Functional Interfaces | None |
|
|||
Physical Interfaces | (1) Modular coil local I&C connections to central I&C systems. |
WBS 14 (Williamson) |
Separate ICD. | Needs to be done in time to incorporate into vacuum vessel design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR. |