WBS 14:  Dave Williamson WBS 62:  Geoff Gettelfinger  Date of Agreement:   December 17, 2002
Project Engineer (s):  Brad Nelson (WBS 1) & Larry Dudek (Ancillary Systems) Systems Engineer:  Bob Simmons

Type of Interface

Scope

Lead Responsibility

Deliverable

Due Date

WAF Task Reference

Design Studies None

 

     
Functional Interfaces None

 

     
Physical Interfaces (1) None - LN2 cooling connections will be to WBs 161 manifold inside cryostat which then connects to WBS 62 outside the cryostat.