WBS 14: Dave Williamson | WBS 62: Geoff Gettelfinger | Date of Agreement: December 17, 2002 |
Project Engineer (s): Brad Nelson (WBS 1) & Larry Dudek (Ancillary Systems) | Systems Engineer: Bob Simmons |
Type of Interface |
Scope |
Lead Responsibility |
Deliverable |
Due Date |
WAF Task Reference |
Design Studies | None |
|
|||
Functional Interfaces | None |
|
|||
Physical Interfaces | (1) None - LN2 cooling connections will be to WBs 161 manifold inside cryostat which then connects to WBS 62 outside the cryostat. |
|