NCSX Procedures
The majority of NCSX administrative procedures will amplify (rather than
supersede) existing PPPL engineering procedures. Please refer to the
NCSX-PPPL Procedure Matrix
for an explanation of the role of each NCSX procedure.
NOTE: THESE SIGNED PROCEDURES ARE
PROTECTED TO PRECLUDE UNAUTHORIZED CHANGES. IF YOU NEED TO PRINT THESE
DOCUMENTS THEY WILL BE UNCONTROLLED COPIES. |
Number of Procedure |
Title of Procedure |
Currently Approved
Revision |
Drafts/Revisions in Process |
Peer
Reviews of Initial Issue |
PROC-001 |
Glossary |
Revision 0 |
|
|
PROC-002 |
Configuration Control |
Revision
1 |
|
12/17/2002 |
PROC-003 |
Interface Control |
Revision
1 |
|
12/19/2002 |
PROC-004 |
NCSX Work Authorization Process |
Revision 2 |
|
5/15/2003 |
PROC-005 |
Electronic Signatures |
Revision 0 |
|
|
PROC-006 |
Control of NCSX Supplier and In-House
Fabrication Information |
Revision
3 |
|
|
PROC-007 |
NCSX Electronic Model and
Drawing/INTRALINK Processes |
Revision 1 |
|
|
PROC-008 |
Fast Response Process |
Procedure
withdrawn and included in PROC-002 Rev 1 |
|
|
PROC-009 |
Request for Deviation
Process |
Revision 3 |
|
|
PROC-010 |
NCSX Design Review Processes |
Revision 0 |
|
|