Subject: Re: GRD specification review
Wayne
Following are my comments:
- Maximum Power
- This should be MW - not kW (a typo!)
a) The facility
shall be designed for a maximum power of 350MW for 0.3s
for the Initial Ohmic Phase of operation.
b) The capability to
accommodate (as a future upgrade) heat loads associated with up to 12MW of power
for 1.2s (including 6MW of neutral beam injection) shall be provided.
- Pulse Repetition Rate
The facility shall be designed for
pulses to be initiated at intervals not exceeding 15 minutes when constrained by
coil cool-down and 5 minutes otherwise.
Why the 15 minutes
constraint? The 5 minute repetition time seems to be an adequate
constraint.
- 1.1.1.1 Experimental Power
All
experimental power for NCSX will be provided through the C-site experimental
power systems except for the TF, PF, and modular coil power supplies that are
connected to the D-site experimental power systems.
I think the
emphasis has to be D-Site power system. Hence can we reword the same as
below?
" The bulk of the experimental power is derived form D-Site and is
used for all the coil systems except for Trim Coils. The rest of the power is
provided from the C-Site systems."
Raki