NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > GRD and Subsystem Specs > WBS 1 Specifications

Legend

 

 

No spec planned

 

TBD 

 

Required

ID

Drafted

ID

Approved

[Note]

See note below table

Please click on document identifier underlined in table below to access the spec...

 

WBS

Description

Development Specs

Product Specs

Other 

11

In-Vessel Components

 

 

 

111

Limiters

 

 

 

112

Internal Liner

 

[2]

 

113

Internal Trim Coils

 

[2]

 

12

Vacuum Vessel Systems

NCSX-BSPEC-120-00

 

 

121

 VV Sub-assembly

 

NCSX-CSPEC-121-02-00

 

 

Prototype Segment

 

NCSX-CSPEC-121-01-01

 

122

Thermal Insulation

 

 

 

123

Heating and Cooling Distribution System

 

 

 

124

Supports

 

 

 

125

 Local I&C

 

 

 

13

Conventional Coils

 

 

 

131

TF Coils

 

 

 

132

PF Coils

 

 

 

133

External Trim Coils

 

 

 

134

Local I&C

 

 

 

14

Modular Coils

NCSX-BSPEC-140-00

 

 

141

Winding Forms

 

 

 

 

Prototype Winding Form

 

NCSX-CSPEC-141-01-04

 

 

Twisted Racetrack  Winding Form

 

NCSX-CSPEC-141-02-00

 

142

Windings and Assembly

 

 

 

 

Winding Facility

 

 

 

 

Autoclave Systems

NCSX-BSPEC-142-01-00

 

 

 

Autoclave Pressure Vessel

 

NCSX-CSPEC-142-01-00

 

 

Autoclave Controls and Support Systems

 

NCSX-CSPEC-142-02-00

 

 

VPI and Molding Equipment

 

 

 

143

Local I&C

 

 

 

15

Structures

 

 

 

151

Coil Support Structure

 

 

 

152

Central Solenoid (CS) Support Structures

 

 

 

153

Local I&C

 

 

 

16

Coil Services

 

 

 

161

LN2 Distribution System

 

 

 

162

Electrical Leads

 

 

 

163

Coil Protection System

 

 

 

17

Cryostat and Base Support Structure

GRD

 

 

171

Cryostat

 

 

 

172

Base Support Structure

 

 

 

18

Field Period Assembly

[1]

 

 

181

Planning and Oversight

 

 

 

182

Preparation of the TFTR Test Cell

 

 

 

183

Receipt, Inspection, and Testing of Coils

 

 

 

184

Receipt, Inspection, and Testing of Vacuum Vessel

 

 

 

185

Field Period Assembly

 

 

 

186

Tooling Design and Fabrication

 

 

 

187

Measurement Systems

 

 

 

19

Stellarator Core Management and Integration

 

 

 

Notes:

[1] The document governing Field Period Assembly activities is the Field Period Assembly Plan. Development specs are only planned for Tooling and Measurement Systems.

[2] Not required as part of MIE Project

Privacy and Security Notice

Please forward comments and questions to the Webmaster