From: Michael Zarnstorff [zarnstorff@pppl.gov]
Sent: Tuesday, May 04, 2004 4:31 PM
To: Wayne T. Reiersen; Paul Goranson; Michael E. Viola; Brad Nelson (Brad Nelson); Mike Zarnstorff; Bob Simmons; Jerry D. Levine; Judith A. Malsbury; Hutch Neilson; Phil Heitzenroeder; Mike Cole
Subject: Re: VV SRD attached
Folks,

My comments:
a) dangling references on pages 5, 8, and 18.
DONE
b) Section 3.2.1.1.1.1 Initial Verification says that capability shall be provided to verify that the system is properly configured.  I take this to include the positioning of the vessel relative to the coils, as this is very important.  Should this be explicitly indicated?
There is an explicit requirements later in the document that calls this out.
c) In section 3.2.1.2.1, there is a statement that the susbsystem configuration should be verified before starting experimental operations and prior to the start of each pulse.  Does this include vessel position?  In the Requirement section, it indicates that capability will be provided (instrumentation) for verification of the proper configuration.  This would require more than the three types of instrumentation listed in section 3.2.2.1.5.

d) Section 4.3, the evaluation criteria and test methods are missing.


Mike.



At 10:55 AM 5/3/2004 -0400, Wayne Reiersen wrote:

For review and comment