NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > SOW
 
Style Instructions Style instructions and a sample document following the prescribed style have been provided.
 
Format Requirements.  Format SOWs in accordance with the SOW Format Guidelines.
 
Statements of Work
1 Stellarator Core Systems

12

Vacuum Vessel

 

121

Vacuum Vessel Sub-Assembly

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-121-01-02

SOW for Weld R&D NCSX-SOW-121-02-03
SOW for VVSA Production

NCSX-SOW-121-03-01

  123 Coolant Tubes SOW for Coolant Tubes NCSX-SOW-123-01-00
13 Conventional Coils

 

131

TF Coils

 

SOW for TF Coil Conductor

NCSX-SOW-131-01-00

SOW for TF Coil Wedge Castings NCSX-SOW-131-02-00
SOW for TF Coil Assemblies NCSX-SOW-131-03-01

 

132

PF Coils

 

SOW for PF Coil Conductor

NCSX-SOW-132-01-00

SOW for PF Ring Coils NCSX-SOW-132-02-00

 

133

Trim Coils

 

NCSX-SOW-131-01-00

NCSX-SOW-131-02-00
NCSX-SOW-131-03-01

14

Modular Coils

 

141

Winding Forms

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-141-01-06\

SOW for Fabrication of the Production MCWFs

NCSX-SOW-141-02-05

 

 

142

Windings and Assembly

 

SOW for Winding Development Activities

NCSX-SOW-142-01-00

SOW for Conductor Testing Activities  NCSX-SOW-142-02-00
SOW for Modular Coils Conductor NCSX-SOW-142-03-00
4 Electrical Power Systems
  432 D- to C-site Systems SOW for Title II Design of the D- to C-Site DC Transmission System NCSX-SOW-432-01-00
7 Test Cell Preparation and Machine Assembly
  75 Test Cell & Basement Assembly Operations SOW for NCSX 30T Crane Upgrade NCSX-SOW-75-01-00

 

Privacy and Security Notice

Please forward comments and questions to the bsimmons@pppl.gov