Statements of Work
1 Stellarator Core Systems

12

Vacuum Vessel

121

Vacuum Vessel Sub-Assembly

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-121-01-02

SOW for Weld R&D NCSX-SOW-121-02-00
SOW for VVSA Production

NCSX-SOW-121-03-00-dE

April 23rd Draft

14

Modular Coils

141 

Winding Forms

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-141-01-05

SOW for Fabrication of the Production MCWFs

NCSX-SOW-141-02-00_dB

April 15 draft

142

Windings and Assembly

SOW for Winding Development Activities

NCSX-SOW-142-01-00

SOW for Conductor Testing Activities  NCSX-SOW-142-02-00
4 Electrical Power Systems
432 D- to C-site Systems SOW for Title II Design of the D- to C-Site DC Transmission System NCSX-SOW-432-01-00
7 Test Cell Preparation and Machine Assembly
75 Test Cell & Basement Assembly Operations SOW for NCSX 30T Crane Upgrade NCSX-SOW-75-01-00
 
 