18
|
Field Period Assembly
|
10/11/06 |
03/11/08 |
|
|
181
|
Planning and Oversight |
|
|
|
|
182 |
Preparation of the
TFTR Test Cell
|
|
|
|
|
183 |
Receipt, Inspection,
and Testing of Coils |
|
|
|
|
184
|
Receipt, Inspection,
and Testing of Vacuum Vessel |
|
|
|
|
185 |
Field Period Assembly |
1 |
|
|
|
|
Field Period Assembly
Plan |
3/30/04 |
|
|
|
|
Station 3 Lift
Fixture, Laser Screens & Brackets |
|
|
12/3/07 |
|
186 |
Tooling Design and
Fabrication
|
|
|
|
|
|
Vacuum Vessel Prep
Fabrication Station |
|
8/11/05 |
9/19/05 |
|
|
Modular Coil Fixture
Assembly Fixture |
2/16/05 |
|
|
|
|
Rigging Trails |
8/12/05 |
|
|
|
|
Station 1 Assembly
Sequence |
12/08/05 |
|
|
|
|
FPA Station 2 Tooling
|
|
|
9/20/06 |
|
|
Station 3 Tooling
|
|
10/30/06 |
7/17/07 |
|
187 |
Measurement Systems |
|
|
|
|
|