NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Reviews > WBS 18 Design Reviews
   

Legend

 

Date

Conducted

Date

 Closed

[Note]

See note below table

Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

18

Field Period Assembly

10/11/06  03/11/08  

 

181

Planning and Oversight

     

 

182

Preparation of the TFTR Test Cell

       

183

Receipt, Inspection, and Testing of Coils

       

184

Receipt, Inspection, and Testing of Vacuum Vessel

       

185

Field Period Assembly

1      
Field Period Assembly Plan 3/30/04
  Station 3 Lift Fixture, Laser Screens & Brackets     12/3/07  

186

Tooling Design and Fabrication

       
  Vacuum Vessel Prep Fabrication Station   8/11/05 9/19/05  
  Modular Coil Fixture Assembly Fixture  2/16/05      
  Rigging Trails 8/12/05      
  Station 1 Assembly Sequence 12/08/05      
  FPA Station 2 Tooling     9/20/06  
  Station 3 Tooling   10/30/06 7/17/07  
187 Measurement Systems        

 

   

Privacy and Security Notice