WBS 4 Electrical Power Systems

CD-2 Baseline

WBS Level 3 WBS Level 4
WBS 4 -Electrical Power Systems
  • Summary Information - Not Changed Since PDR Baseline
  • Overall Backup - Not Changed Since PDR Baseline
    • CD-4 Inclusion to add Ground Fault Monitor to WBS 445
    • Only escalation due to re-sequencing of activities to conform to funding constraints => no change in estimate
      • WBS 411
      • WBS 422
      • WBS 431 thru WBS 433
      • WBS 441 thru WBS 445
      • WBS 452 & WBS 453

WBS 41 - AC Power Systems

WBS 411 - Auxiliary AC Power Systems

WBS 412 - Experimental AC Power Systems

WBS 42 - AC/DC Convertors WBS 421 - C-Site AC/DC Convertors - NOT in BASELINE

WBS 422 - Experimental AC Power Systems

WBS 43 - DC Systems WBS 431 - C-Site DC Power Systems

WBS 432 - D to C-Site DC Power Systems

WBS 433 - D -Site DC Power Systems

WBS 44 - Control & Protection Systems WBS 441 - Electrical Interlock Systems

WBS 442 - Kirk Key Interlock Systems

WBS 443 - Real Time Control Systems

WBS 444 - Instrumentation Systems

WBS 445 - Coil Protection Systems

WBS 446 - Ground Fault Monitoring Systems  - Changes since PDR Baseline - CD-4 inclusions to add Ground Fault Monitor (see Backup)

WBS 45 - Power Systems Design & Integration WBS 451 - Systems design & Interfaces

WBS 452 - Electrical Systems Support

WBS 453 - Systems Testing (PTPs)

WBS 46 - FCPC Building Modifications