NCSX Procedures

The majority of NCSX administrative procedures will amplify (rather than supersede) existing PPPL engineering procedures. Please refer to the NCSX-PPPL Procedure Matrix for an explanation of the role of each NCSX procedure.

NOTE:  THESE SIGNED PROCEDURES ARE PROTECTED TO PRECLUDE UNAUTHORIZED CHANGES.  IF YOU NEED TO PRINT THESE DOCUMENTS THEY WILL BE UNCONTROLLED COPIES.

Number of Procedure

Title of Procedure

Currently Approved Revision

  Drafts/Revisions in Process

Peer Reviews of Initial Issue

 PROC-001 Glossary Revision 0    
 PROC-002 Configuration Control Revision 3   12/17/2002
 PROC-003 Interface Control Revision 1   12/19/2002
 PROC-004 NCSX Work Authorization Process Revision 2   5/15/2003
 PROC-005 Electronic Signatures Revision 0    
 PROC-006 Control of NCSX Supplier and In-House Fabrication Information Revision 4    
PROC-007 NCSX Electronic Model and Drawing/INTRALINK Processes Revision 3  
PROC-008 Fast Response Process

Revision 1

   
PROC-009 Request for Deviation Process Revision 5    
PROC-010 NCSX Design Review Processes Revision 1    
PROC-011 Use of FroTools Program for Accessing NCSX Pro/E Drawing Revision 0    
PROC-012 Accessing NCSX Construction Information Revision 0    