Engineering > Design Reviews >WBS 1 Design Reviews > Prototype MCWF Peer Review
Review Title Prototype Modular Coil Winding Form Peer Review
Date 23 January 2003
Cognizant Engineer Brad Nelson
Responsible Line Manager Wayne Reiersen
Review Board Chairperson Larry Dudek
Review Board Members Jim Chrzanowski, Steve Raftopoulos, B. Nelson (ORNL) Geoff Gettelfinger
Invited Attendees P. Heitzenroeder, H.Neilson, Larry Sutton, H.M. Fan, B. Simmons, D. Williamson (ORNL)
Other Attendees R.Hawryluk, R. Strykowsky, W. Reiersen, M. Zarnstorff, A.Brooks, T. Brown, M. Williams
Charge

 

Design Review Material

Announcement

Presentation

Chits and Project Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules    
Regulatory compliance including USQD and NEPA not presented
Disposition of CHITS from previous reviews None
Cost objectives

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

This review was called prior to the release of the design package to the coil winding form manufacturing development subcontractor.  The purpose of the review was to address the poloidal break (flagged as an issue at the PAC meeting), the copper cladding (a source of considerable expense and technical uncertainty in the subcontractor proposal responses), and tolerances (ditto).  Recommendations on how these issues are to be addressed were presented at the peer review.  The schedule for the coil development and delivery was also discussed. 

 

Ten (10) Chits were generated from this review.  The chits were dispositioned following the review and copies are attached.  Once these chits are resolved and prior to the release of the drawing package to the subcontractor a subgroup of this review will be reconvened to review the final drawings. 

Disposition

(check one)

 Acceptable
 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 Incomplete - Additional work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 