WBS
|
Description
|
Peer
Review or CDR
|
PDR
|
FDR
|
Other
|
11
|
In-Vessel
Components
|
|
|
|
 |
111
|
Limiters
|
|
|
|
 |
112
|
Internal
Liner
|
|
[1]
|
|
 |
113
|
Internal
Trim Coils
|
|
[1]
|
|
 |
12
|
Vacuum
Vessel Systems
|
|
10/6/03
|
|
 |
121
|
Assembly
|
|
|
|
 |
 |
VV Port
Configuration
|
1/29/04 |
|
|
 |
 |
Prototype
Vacuum Vessel Segment (PVVS)
|
 |
|
7/8/03
|
 |
122
|
Thermal
Insulation
|
 |
|
|
 |
123
|
Heating
and Cooling Distribution System
|
|
|
|
 |
124
|
Supports
|
|
|
|
 |
125
|
Local
I&C
|
|
|
|
 |
13
|
Conventional
Coils
|
|
|
|
 |
131
|
TF
Coils
|
|
|
|
 |
132
|
PF
Coils
|
|
|
|
 |
133
|
External
Trim Coils
|
|
|
|
 |
134
|
Local
I&C
|
|
|
|
 |
14
|
Modular
Coils
|
|
10/6/03
|
|
 |
141
|
Winding
Forms
|
|
|
|
 |
 |
MCWF
Manufacturing Development and Prototype Fabrication Technical
Issues
|
01/23/03
|
|
|
 |
 |
Prototype
MCWF
|
|
|
09/30/03
|
 |
142
|
Windings
and Assembly
|
|
|
|
 |
 |
VPI
and Molding Design
|
01/15/03
|
|
|
 |
 |
Racetrack
Test Coil
|
|
|
06/12/03
|
 |
 |
Twisted Racetrack
Coil Winding Form FDR
|
|
|
11/20/03
|
 |
143
|
Local
I&C
|
|
|
|
 |
144
|
Modular Coil
Winding Facility and Fixtures
|
|
|
|
 |
 |
Winding
Facility
|
|
|
|
 |
 |
Autoclave
Systems
|
|
01/08/03
|
|
 |
 |
Autoclave
Pressure Vessel and Controls
|
|
|
06/03/03
|
 |
 |
Turning Fixture FDR
|
|
|
12/01/03
|
 |
 |
Coil Test Facility
DC Bus Modification
|
|
|
12/04/03
|
 |
15
|
Structures
|
|
|
|
 |
151
|
Coil
Support Structure
|
|
|
|
 |
152
|
Central
Solenoid (CS) Support Structures
|
|
|
|
 |
153
|
Local
I&C
|
|
|
|
 |
16
|
Coil
Services
|
 |
|
|
 |
161
|
LN2
Distribution System
|
|
|
|
 |
162
|
Electrical
Leads
|
|
|
|
 |
163
|
Coil
Protection System
|
|
|
|
 |
17
|
Cryostat
and Base Support Structure
|
|
|
|
 |
171
|
Cryostat
|
|
|
|
 |
172
|
Base
Support Structure
|
|
|
|
 |
18
|
Field
Period Assembly
|
|
|
|
 |
181
|
Planning
and Oversight
|
|
[2]
|
|
 |
182
|
Preparation
of the TFTR Test Cell
|
|
|
|
 |
183
|
Receipt,
Inspection, and Testing of Coils
|
|
[2]
|
|
 |
184
|
Receipt,
Inspection, and Testing of Vacuum Vessel
|
|
[2]
|
|
 |
185
|
Field
Period Assembly
|
|
|
|
 |
186
|
Tooling
Design and Fabrication
|
|
|
|
 |
187
|
Measurement
Systems
|
|
|
|
 |
19
|
Stellarator
Core Management and Integration
|
|
[2]
|
|
 |