Engineering > Design Reviews > WBS 1 Design Reviews

Legend

 

 

Not required

 

Required

Date

Scheduled

Date

Conducted

Date

Chits Dispositioned

Date

 Closed

[Note]

See note below table

Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

11

In-Vessel Components

 

 

 

111

Limiters

 

 

 

112

Internal Liner

 

[1]

 

113

Internal Trim Coils

 

[1]

 

12

Vacuum Vessel Systems

 

10/6/03

 

121

 Assembly

 

 

 

VV Port Configuration 1/29/04    

Prototype Vacuum Vessel Segment (PVVS)

 

7/8/03

122

Thermal Insulation

 

 

123

Heating and Cooling Distribution System

 

 

 

124

Supports

 

 

 

125

 Local I&C

 

 

 

13

Conventional Coils

 

 

 

131

TF Coils

 

 

 

132

PF Coils

 

 

 

133

External Trim Coils

 

 

 

134

Local I&C

 

 

 

14

Modular Coils

 

10/6/03

 

141

Winding Forms

 

 

 

MCWF Manufacturing Development and Prototype Fabrication Technical Issues

01/23/03

 

 

 Prototype MCWF

 

 

09/30/03

142

Windings and Assembly

 

 

 

VPI and Molding Design

01/15/03

Racetrack Test Coil

 

 

06/12/03

Twisted Racetrack Coil Winding Form FDR     11/20/03

143

Local I&C

 

 

 

144 Modular Coil Winding Facility and Fixtures      

Winding Facility

 

 

 

Autoclave Systems

 

01/08/03

 

Autoclave Pressure Vessel and Controls

 

 

06/03/03

Turning Fixture FDR     12/01/03
Coil Test Facility DC Bus Modification     12/04/03

15

Structures

 

 

 

151

Coil Support Structure

 

 

 

152

Central Solenoid (CS) Support Structures

 

 

 

153

Local I&C

 

 

 

16

Coil Services

 

 

161

LN2 Distribution System

 

 

 

162

Electrical Leads

 

 

 

163

Coil Protection System

 

 

 

17

Cryostat and Base Support Structure

 

 

 

171

Cryostat

 

 

 

172

Base Support Structure

 

 

 

18

Field Period Assembly

 

 

 

181

Planning and Oversight

 

[2]

 

182

Preparation of the TFTR Test Cell

 

 

 

183

Receipt, Inspection, and Testing of Coils

 

[2]

 

184

Receipt, Inspection, and Testing of Vacuum Vessel

 

[2]

 

185

Field Period Assembly

 

 

 

186

Tooling Design and Fabrication

 

 

 

187

Measurement Systems

 

 

 

19

Stellarator Core Management and Integration

 

[2]

 

Notes:

[1] Not in MIE Project, but design reviews will be required.

[2] Not design related. No design reviews required.