Review
Title |
Shield Wall Reconfiguration
PDR |
Date |
09 March 2004 |
Cognizant
Engineer |
Bob Parsells |
Responsible Line Manager |
Erik Perry |
Review Board Chairperson |
Larry Dudek |
Review Board Members |
Henry Kugel, Mike Kalish,
Jerry Levine |
Invited Attendees |
|
Other Attendees |
|
Charge |
1. The shielding
capability for full power long pulse plasmas will be limited by the
present shielding and will be augment as required.
2. The shielding blocks
will be seismically qualified to be stacked without bracing.
3. The bottom course of
shielding will provide penetrations for services.
4. The shielding
configuration will be phased to coincide with the Radiation Safety
Plan. |
Design Review Material |
Announcement
Presentation
Chits and Project
Disposition |
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check one) |
1 Acceptable |
1 Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1
Incomplete -
Additional work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |