NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Reviews > WBS 71
Review Title Shield Wall Reconfiguration PDR
Date 09 March 2004
Cognizant Engineer Bob Parsells
Responsible Line Manager Erik Perry
Review Board Chairperson Larry Dudek
Review Board Members Henry Kugel, Mike Kalish, Jerry Levine
Invited Attendees  
Other Attendees  
Charge 1. The shielding capability for full power long pulse plasmas will be limited by the present shielding and will be augment as required.

2. The shielding blocks will be seismically qualified to be stacked without bracing.

3. The bottom course of shielding will provide penetrations for services.

4. The shielding configuration will be phased to coincide with the Radiation Safety Plan.

Design Review Material

Announcement

Presentation

Chits and Project Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified  
Development plans and schedules  
Regulatory compliance including USQD and NEPA  
Disposition of CHITS from previous reviews  
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

Summary of Results

 

Disposition

(check one)

1 Acceptable
1  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
1  Incomplete - Additional work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
1   Action required by Disposition is complete

Privacy and Security Notice