Review Title VVSA Product Spec Review
Date 08 April 2004
Cognizant Engineer Paul Goranson for (Spec and PVVS Plan), Mike Viola for (SOW)
Responsible Line Manager Wayne Reiersen
Review Board Chairperson John Schmidt
Review Board Members Phil Heitzenroeder, Frank Malinowski, Mike Cole, Larry Dudek
Invited Attendees Malinowski, Reiersen
Other Attendees  
Charge
  • Is the VVSA SOW suitable for the production contract? Of particular importance is the degree of PPPL control over the supplier's process: is the entire MIT/QA plan PPPL - approved or just specified hold points and inspections? Also, the extent and frequency of formal reporting required.

  • Is the product spec consistent with the design-to requirements?

  • Does the product spec provide an adequate technical basis for manufacture?

Design Review Material

Announcement

VVSA Product Spec (as amended during the review)

Chits and Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified With resolution of chits
Development plans and schedules Not addressed
Regulatory compliance including USQD and NEPA Not addressed
Disposition of CHITS from previous reviews Not applicable
Cost objectives Not addressed

Other review objectives addressed

(Attachment 4 of ENG-033)

Not applicable

Summary of Results

Review successful with resolution of CHITS

Disposition

(check  one)

1  Acceptable
 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
1  Action required by Disposition is complete