Review
Title |
VV Cooling Tube FDR |
Date |
05 May 2005 |
Cognizant
Engineer |
Paul Goranson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
Fred Dahlgren, Mike Viola,
Mike Kalish, Mike Cole, Geoff Gettelfinger, Larry Dudek |
Invitees |
Hutch Neilson, Phil
Heitzenroeder, Jim Chrzanowski, HM Fan, Kevin Freudenberg, Mike Zarnstorff,
Bob Simmons, Brent Stratton |
Attendees |
Wayne Reiersen, Hutch
Neilson, Brad Nelson, Fred Dahlgren, Brent Stratton, Mike Cole, Kevin
Freudenberg, Mike Kalish, Mike Zarnstorff, Geoff Gettelfinger, Larry Dudek
|
Charge |
Heating/cooling tube
system
1. Is the heating/cooling design (including trace tubing, manifolds,
auxiliary heaters, and thermocouples) adequate for temperature
control of the vacuum vessel during standby, normal operation, and
bakeout?
2. Are the interfaces with the diagnostic magnetic loops defined?
3. Are the interfaces with the cryostat feasible?
4. Are the analyses complete and documented?
5. Is the heating load within the capacity of the envisioned helium
bakeout skid?
6. Are the design drawings and specifications adequate for
procurement?
VV supports
1. Is the design of the VV support system adequate for normal,
fault, and handling loads, including upgraded first wall and a full
complement of diagnostics?
2. Do the supports have adequate capability and adjustment to
facilitate field period assembly and final assembly?
3. Are the interfaces with other systems (primarily the mod coil
shell) adequately defined?
4. Are the analyses complete and documented?
5. Are the design drawings adequate for procurement?
|
Design Review Material |
Announcement
Presentation
Design Review Report
Drawings
Specification
Chits and Disposition Plan |
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |