NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Review > WBS 186
Review Title Vacuum Vessel Prep Fabrication Station
Date 11 August  2005
Cognizant Engineer Tom Brown
Responsible Line Manager Brad Nelson
Review Board Chairperson Mike Cole
Review Board Members Paul Goranson, Brent Stratton, George Labik, Mike Cole
Invitees Wayne Reiersen, Hutch Neilson, Jim Lyon, Dave Williamson, Jim Chrzanowski, Erik Perry, Larry Dudek, Fred Dahlgren, Jerry Levine
Attendees Jim Chrzanowski, Wayne Reiersen, George Labik, Brent Stratton, Jerry Levine, Larry Dudek, Fred Dahlgren, Mike Cole, David Williamson, Paul Goranson, Jim Lyons
Charge The following are the charge questions:
1. Are the requirements well defined?
2. Does the design adequately address the requirements?
3. Does the analysis adequately underpin the design?
4. Do the drawings define the design adequately to be used as the sole basis for fabrication and acceptance of the support fixture?
5. Has safety been adequately addressed in the design of the support fixture?
6. Can the support fixture be fabricated and installed within the budget and schedule identified in the project baseline?
7. What additional work or documentation should be done in order to complete the final design?
Design Review Material

Announcement

Chits and Disposition Plan

Design Summery

Presentation

Tooling Study

Results and Discussion

Design Review Report

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules  
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

Disposition

(check  one)

 1  Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1  Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1  Action required by Disposition is complete

Privacy and Security Notice

Please forward comments and questions to the Webmaster