Engineering > Design Review > WBS 186
Review Title Rigging Trials Peer Review
Date 12 August  2005
Cognizant Engineer Tom Brown
Responsible Line Manager Brad Nelson
Review Board Chairperson Larry Dudek
Review Board Members Mike Cole, Mike Viola, Art Brooks, Jim Chrzanowski, Steve Raftopoulos
Invitees Wayne Reiersen, Hutch Neilson, Erik Perry, Larry Dudek, Jerry Levine , Fred Dahlgren, Jim Chrzanowski, Mike Cole, Brad Nelson, David Williamson, Paul Goranson, Mike Viola, Art Brooks, Steve Raftopoulos, Ron Strykowsky, Frank Malinowski, Judy Malsbury, Greg Pitonak, Jeff Makiel,
Attendees Larry Dudek, Hutch Neilson, Art Brooks, Bill Slavin, Judy Malsbury Mike Viola, Wayne Reiersen, Steve Raftopoulos, Jim Chrzanowski, Mike Zarnstorff, Phil Heitzenroeder, Mike Cole, Jim Lyons
Charge 1. Does the block test simulation adequately predict the ability to successfully move the MC over the VV within the installation tolerances?

2. Can the laser screens be fabricated and adequately located within some specified tolerances to properly define the path of motion? Is there a better approach?

3. If the MC is moved in some manner that places it off the required path, is there a method to find where it is, then retract and reposition it to be on the correct path?

4. Technicians are required to stabilize the MC (in close proximity to it) while it is supported by the crane.  Are there any safety issues that need to be addressed prior to making this decision?

5. Is there additional work or documentation that should be done prior to making this decision?

Design Review Material

Announcement

Chits and Disposition Plan

Presentation

Summary of Results

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified  
Development plans and schedules   
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

Disposition

(check  one)

   Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete