Review Title Outboard Bolted Joint Shims
Date 29 June  2007
Cognizant Engineer David Williamson
Responsible Line Manager Brad Nelson
Review Board Chairperson Wayne Reiersen
Review Board Members Phil Heitzenroeder, Art Brooks, Mike Viola, Larry Dudek
Invitees Mike Cole, Kevin Freudenberg, Len Myatt, Brad Nelson, Paul Goranson, Paul Fogarty, Phil Heitzenroeder, Art Brooks, HM Fan, Mike Viola, Larry Dudek, Tom Brown, Geoff Gettelfinger, John Edwards, Mike Duco, Gary McGinnis, Hutch Neilson, Mike Williams, Jeff Makiel, Greg Pitonak, Ron Strykowsky, Mike Zarnstorff
Attendees Mike Cole, Wayne Reiersen, Phil Heitzenroeder, Tom Brown, John Edwards, Jeff Makiel, Hutch Neilson, Paul Fogarty, Jim McGinnis, Brad Nelson, Dave Williamson, Paul Goranson, Mike Zarnstorff, Geoff Gettelfinger
Charge 1. Are the requirements well defined?

2. Does the design meet the requirements?

3. Is the design adequately underpinned by analysis and testing?

4. Is the shim friction testing sufficient to proceed with procurement of coated shims?

5. Is the shim coating spec complete?

6. Are the drawings complete and ready to be released for fabrication?

7. Have all relevant chits from previous MC design reviews been adequately addressed?

Design Review Material

Announcement

Chits and Disposition

Presentation (Gettelfinger)

Presentation (Cole)

Review Committee Report

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

 

Disposition

(check  one)

 1 Acceptable
  1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
  1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete