        | Review
          Title | Outboard Bolted Joint Shims |  
        | Date | 29 June  2007 |  
        | Cognizant
          Engineer | David Williamson |  
        | Responsible Line Manager | Brad Nelson |  
        | Review Board Chairperson | Wayne Reiersen |  
        | Review Board Members | Phil Heitzenroeder, Art 
		Brooks, Mike Viola, Larry Dudek |  
        | Invitees | Mike Cole, Kevin 
		Freudenberg, Len Myatt, Brad Nelson, Paul Goranson, Paul Fogarty, Phil 
		Heitzenroeder, Art Brooks, HM Fan, Mike Viola, Larry Dudek, Tom Brown, 
		Geoff Gettelfinger, John Edwards, Mike Duco, Gary McGinnis, Hutch 
		Neilson, Mike Williams, Jeff Makiel, Greg Pitonak, Ron Strykowsky, Mike 
		Zarnstorff |  
        | Attendees | Mike Cole, Wayne Reiersen, 
	Phil Heitzenroeder, Tom Brown, John Edwards, Jeff Makiel, Hutch Neilson, 
	Paul Fogarty, Jim McGinnis, Brad Nelson, Dave Williamson, Paul Goranson, 
	Mike Zarnstorff, Geoff Gettelfinger |  
        | Charge | 1. Are the requirements 
	well defined? 2. Does the design meet the 
	requirements?  3. Is the design adequately 
	underpinned by analysis and testing? 4. Is the shim friction testing 
	sufficient to proceed with procurement of coated shims?  5. Is the shim coating spec complete?
	 6. Are the drawings complete and ready 
	to be released for fabrication?  7. Have all relevant chits from 
	previous MC design reviews been adequately addressed?  |  
        | Design Review Material | 
        
        Announcement 
        
		Chits and 
		Disposition 
        
		Presentation 
		(Gettelfinger) 
        
		Presentation (Cole) 
        
		Review Committee Report |  
        | Review Board Report |  |  
        | Items Reviewed | 
    
     | Sat | Unsat | Comments |  
        | Appropriate requirements identified |  |   |  |  
        | Development plans and schedules |   |   |  |  
        | Regulatory compliance including USQD and NEPA |  |   |  |  
        | Disposition of CHITS from previous reviews |  |   |  |  
        | Cost 
          objectives |  |    |  |  
        | 
          Other 
          review objectives addressed 
          
          (Attachment 4 of ENG-033) |  |   |  |  
        | 
          Summary of Results |  |  
        | 
          Disposition 
          (check 
     one) | 1 Acceptable |  
        | 1 Acceptable pending resolution of concerns - 
    CHITS identified above must be resolved prior to installation. |  
        | 1 Incomplete -
    Additional design 
    work is required prior to another design review. |  
        | 
          Cog Engineer Close-out 
          (check 
     when done) |  |  
        | 1  
    Action required by Disposition is complete |  |