Review Title Modular Coil Inboard Interface CC PDR
Date 7 August 2007
Cognizant Engineer Dave Williamson
Responsible Line Manager Brad Nelson
Review Board Chairperson Phil Heitzenroeder
Review Board Members Wayne Reiersen, Larry Dudek, Stephen Langish, Mike Cole, HM Fan, Art Brooks, Mike Viola
Invitees Geoff Gettelfinger, Stephen Langish, Steve Raftopoulos, Phil Heitzenroeder, Paul Goranson, Larry Dudek, Tom Brown, Art Brooks, H.M. Fan, Paul Fogarty, Kevin Freudenberg, Tom Meighan, Dave Williamson, Wayne Reiersen, Mike Viola, Brad Nelson, Hutch Neilson, Ron Strykowsky, Jim Lyons, Mike Williams, Jim Anderson, Mike Zarnstorff, Judy Malsbury, Jerry Levine, Jeff Makiel, Greg Pitonak
Attendees Phil Heitzenroeder, G. McGinnis, Dave Williamson, Stephen Langish, Wayne Reiersen, Mike Cole, Paul Fogarty, Kevin Freudenberg, Paul Goranson, Frank Malinowski, Brad Nelson, Robert Parsells, Larry Dudek, Jeff Makiel, Mike Viola
Charge 1) Are the requirements defined? What is the proposed design?

2) What are the results of access studies to-date?

3) Is the analysis consistent with the proposed design?

4) What is the plan to complete final design?

5) Have prior design review chits been addressed?

6) Are any coil modifications (extra holes) ready to be approved?

7) Have all technical, cost/schedule, and safety risks been addressed?

Design Review Material

Announcement

Chits and Disposition

Presentation

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified X  
Development plans and schedules X
Regulatory compliance including USQD and NEPA   (Not applicable to this review)
Disposition of CHITS from previous reviews X  
Cost objectives X Refer to Chit 2

Other review objectives addressed

(Attachment 4 of ENG-033)

 X  

Summary of Results

 The committee judged the review to be successful. However, the committee spent quite some time discussing the number bolts in the C-C connection.  It was finally concluded that we should continue with the current plan to add six bolts and shims top and 6 6 more bottom.  Although a fewer number of bolts might also be acceptable, it was felt that the modest incremental cost for all the bolts was justified by the additional risk reduction that it would provide. This may be revisited if the access studies indicate access limitations, but barring this, we will proceed with all bolts.   It was also recommended that the FDR for the C-C interface design be decoupled from the tool development so that this FDR can be held as soon as possible.

Disposition

(check  one)

  Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
  1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete