Review
Title |
FPA Station 5 PDR |
Date |
11 March 2008 |
Cognizant
Engineer |
Tom Brown |
Responsible Line Manager |
Phil Heitzenroeder |
Review Board Chairperson |
Jim Chrzanowski |
Review Board Members |
Mike Viola, Erik Perry,
Shawn Connolly, Kevin Freudenberg, Paul Goranson |
Invitees |
Larry Dudek, Mike Cole, John
Edwards, Hutch Neilson, Phil Heitzenroeder, Art Brooks, Mark Smith, Mike
Viola, Erik Perry, Shawn Connolly, Kevin Freudenberg, Paul Goranson, Jim
Chrzanowski |
Attendees |
Jim Chrzanowski, Hutch
Neilson, Phil Heitzenroeder, Mark Smith, Mike Viola, Erik Perry, Shawn
Connolly Lew Morris, Art Brooks, Larry Dudek, Mike Coil, Paul Goranson,
Kevin Freudenberg |
Charge |
The charge
to the review committee is as follows:
1) Are the requirements adequately
defined and documented? Note: This does not
require a SRD because it is not part
of the experimental facility.
However, the requirements will be
defined and included as an addendum to
the Sequence Plan, which will be
archived on the NCSX Web as part of
this review.
2) Is the design consistent with the
requirements?
2) Are the design basis analyses and
any supporting R&D documented and adequate?
3) Have the drawings and models been
promoted to PD release level? |
Design Review Material |
Announcement
Chits and Disposition
Presentation
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
N/A No chits from previous
reviews |
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
A PDR of the Assembly
Station 5 was successfully presented by Tom Brown. A review of the
requirements as well as detail description of the support structure
components was presented. The fixture drawings are nearly
complete, and the analysis of the loads and deflections was available. A
number of chits were generated recommending some improvement to the
design including additional outriggers and increasing the design safety
factor to five since personnel will be inside or under the structure
during various elements of the Station 5 activities. Overall the
review was deemed successful by the review committee pending resolution
of the chits generated. |
Disposition
(check
one) |
1 Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |