NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Reviews > WBS 7 Design Reviews

Legend

 

 

Required

Date

Scheduled

Date

Conducted

Date

Chits Dispositioned

Date

 Closed

[Note]

See note below table

Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

7

Test Cell Prep and Machine Assembly

71

Shield Wall Reconfiguration

 

Shield Wall Reconfiguration PDR 3/9/04
72 Control Room Refurbishment  

73

 Platform Design and Fabrication

74 Machine Assembly Planning and Oversight
75 Test Cell & Basement Assembly Operations
76 Tooling Design and Fabrication
77 Measurement Systems

 

Privacy and Security Notice

Please forward comments and questions to the Webmaster