Bob,
The next step on this is to prepare a Safety
Assessment Document (SAD) for NCSX. This document will be prepared in
accordance with ESHD 5008 Section 11, Chapter 1. It will include
descriptions of the NCSX systems and components, including their key safety
aspects, and a failure modes and effects analysis (FMEA). The PHA table
will be finalized and included as part of the SAD. The NSTX SAD provides a
good example of this (see http://nstx.pppl.gov/nstx/Project_Control_Documents/Safety%20Assessment/
and http://nstx.pppl.gov/nstx/Engineering/NSTX_Eng_Site/Technical/General/NSTX_FMEA_61_4.doc).
The
NCSX SAD must be approved prior to the start of operations. Work should
begin on this document at least one year prior.
Jerry
On
4/4/07 9:21 AM, "Bob Simmons" <bsimmons@pppl.gov> wrote:
> Jeff,
>
> Here is what I could find:
>
> Go to NCSX Engineering Web => ES&H Tab => Project Docs =>
Project
> Preliminary Hazard Analysis (Rev 1) and also two specific
hazard
> analyses for specific areas of work (Mfg Facility and Coil
Test
> Facility).
>
> Jerry and Wayne - your thoughts on
this? Do we need a "final" PHA? And
> if so, when?
>
> BobS
>
>
> Bob Simmons
> NCSX Systems Engineering Support
Manager
> Princeton Plasma Physics Laboratory (PPPL)
> Tel #: (609)
243-2766
> Fax #: (609) 243-3030
>
> -----Original
Message-----
> From: Jeffrey Makiel
> Sent: Wednesday, April 04,
2007 9:14 AM
> To: Bob Simmons
> Subject: NCSX Hazard
Analysis
>
> Bob,
>
> Does NCSX have a Hazard Analysis
document? All I could find was a dead
> link to a 'Preliminary
Hazard Anaysis (rev1)' in the CD-2 performance
> baseline documentation
list at...
>
>
>
> http://ncsx.pppl.gov//Meetings/PDR/CD2/Perf_Baseline_Documen.html
>
<http://ncsx.pppl.gov/Meetings/PDR/CD2/Perf_Baseline_Documen.html>
>
>
>
> and some mention that we have one
during CD-1 at...
>
>
>
> http://ncsx.pppl.gov/Management/Documents/NCSX_CD1_appr.pdf
>
>
>
> thanks...Jeff
>
>
>
> Jeffrey Makiel
>
> Princeton Site Office
>
>
Office of Science
>
> US. Department of Energy
>
> PO
Box 102
>
> Princeton, NJ 08542
>
> Phone: (609)
243-3721
>
> Fax: (609) 243-2032
>
> E-mail:
jmakiel@pppl.gov
>
>
>
Jerry D.
Levine
Head, Environment, Safety & Health (ES&H)
DOE Princeton
Plasma Physics Laboratory
P.O. Box 451
Princeton, New Jersey
08543
C-Site, Module 6, Room 104, MS01
Lab Phone: 609-243-3439
Cell Phone: 609-651-9081
Lab Pager #340 Skypager Pin
# 1335520
Fax: 609-243-3375
You can visit the home page of the DOE
Princeton Plasma Physics Laboratory
at http://www.pppl.gov