| Title | Document Number | 
  
    | 
	Modular Coil Plans | 
  
    | Modular Coil Manufacturing, 
	Inspection, Test , and Quality Assurance Plan | 
	NCSX-MITQA-142-00 | 
  
    | Modular Coil Winding Dimensional 
	Control Plan | NCSX-PLAN-MCWDC-00 | 
  
    | 
	Modular Coil
	Manufacturing Procedures | 
  
    | Modular Coil
	Fabrication-Winding Form Preparation Activities | 
	D-NCSX-MCF-001-03
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Coil
	Fabrication-Winding Station Activities | D-NCSX-MCF-002-02 
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Coil
	Fabrication-VPI/Autoclave Activities | 
	
	D-NCSX-MCF-003-03 
	 (ORIGINAL IN OPS CENTER) | 
  
    |  | D-NCSX-MCF-004-01
	(ORIGINAL IN OPS CENTER) | 
  
    | Dimensional Control and Metrology for the NCSX Modular Coils | D-NCSX-MCF-005-02 
	
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Coils Operating Procedures | 
  
    | Modular Coil Manufacturing 
	Facility Autoclave Operating Procedure | D-NCSX-OP-G-162-01 
	
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Emergency Response Procedures | 
  
    | Modular Coil Manufacturing 
	Facility Emergency Response Procedure | D-NCSX-OP-EO-41-00
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Lift Procedures | 
  
    | Modular Coil Winding Form Lift Procedure | D-L-NCSX-983-01
	
	
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Coil Lift Procedure | D-L-NCSX-984-00
	
	
	(ORIGINAL IN OPS CENTER) | 
  
    | Finished Modular Coil Winding Form Lift Procedure | D-L-NCSX-996-00
	
	(ORIGINAL IN OPS CENTER) | 
  
    | Modular Repair Procedures | 
  
    | Modular Coil Lead Repair - Part 1 Exploration | 
	D-NCSX-RP-STEL-057-00 (ORIGINAL IN OPS CENTER) | 
  
    | Modular Coil Lead Repair - Part 2 Repair | D-NCSX-RO-STEL-058-00 
	(Draft in Review) | 
  
    | Modular Access Procedures | 
  
    | Personnel Access of the NCSX Autoclave | 
	D-NCSX-OP-763-00
	(ORIGINAL IN OPS CENTER) | 
  
    |  | 
  
    | 
		
		Toroidal Field Coils Plans and Procedures | 
	
    | Title | Document Number | 
  
    | 
	Toroidal Field Coil Plans | 
  
    | Toroidal Coil Manufacturing, 
	Inspection, Test , and Quality Assurance Plan | NCSX-MITQA-131-01-00 
	 
	(Approved) | 
  
    |  | 
  
    | 
		Field Period Assembly 
		Plans and Procedures | 
  
    | Field Period Assembly Plans | 
  
    | Field Period Assembly Plan | NCSX-PLAN-FPA-00-dA | 
  
    | Field Period Assembly Manufacturing, 
	Inspection, Test , and Quality Assurance Plan | NCSX-MIT/QA-185-01-00 | 
  
    | Station 1 Field Period 
	Assembly Sequence Plan | 
	
	NCSX-PLAN-FPA1SEQ-00 | 
  
    | 
	Field Period Assembly Station 1 
	Dimensional 
	Control Plan | 
	
	NCSX-PLAN-FPA1DC-00
	 
	 | 
  
    | Field 
	Period Assembly Procedures | 
  
    | Field Period Assembly 
	Component Receipt Inspection | D-NCSX-FPA-QA1-00 
	(ORIGINAL IN OPS CENTER) | 
  
    | Field Period Assembly Station 
	One | D-NCSX-FPA-001-00 
	(ORIGINAL IN OPS CENTER) | 
  
    | 
	Field Period Assembly Lift Procedures | 
  
    | VVSA Lift Procedure | D-L-NCSX-997-00
	
	(ORIGINAL IN OPS CENTER) |