NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Detailed Manufacturing Plans and Procedures

 

Minor Procedure Change Form
 

Final Assembly & Test Plans

Title

Document Number
Final Assembly Plan NCSX-PLAN-FPA-00-dB

Test & Evaluation Plan

NCSX-PLAN-TEP_00-dD
 

Manufacturing Facility Plans

Title

Document Number
Manufacturing Facility Operations Plan NCSX-PLAN-MFOP-01  (Note: Replaces the previous Coil Manufacturing Facility Operations Plan)
 
Modular Coil Plans and Procedures

Title

Document Number

Modular Coil Plans

Modular Coil Manufacturing, Inspection, Test , and Quality Assurance Plan

NCSX-MITQA-142-00

Modular Coil Winding Dimensional Control Plan NCSX-PLAN-MCWDC-00

Modular Coil Manufacturing Procedures

Modular Coil Fabrication-Winding Form Preparation Activities

D-NCSX-MCF-001-03 (ORIGINAL IN OPS CENTER)

Modular Coil Fabrication-Winding Station Activities D-NCSX-MCF-002-02 (ORIGINAL IN OPS CENTER)
Modular Coil Fabrication-VPI/Autoclave Activities

D-NCSX-MCF-003-03 (ORIGINAL IN OPS CENTER)

Modular Coil Fabrication-Post VPI Activities

D-NCSX-MCF-004-01 (ORIGINAL IN OPS CENTER)
Dimensional Control and Metrology for the NCSX Modular Coils   D-NCSX-MCF-005-02 (ORIGINAL IN OPS CENTER)
Modular Coils Operating Procedures
Modular Coil Manufacturing Facility Autoclave Operating Procedure D-NCSX-OP-G-162-01 (ORIGINAL IN OPS CENTER)
Modular Emergency Response Procedures
Modular Coil Manufacturing Facility Emergency Response Procedure D-NCSX-OP-EO-41-00 (ORIGINAL IN OPS CENTER)
Modular Lift Procedures
Modular Coil Winding Form Lift Procedure D-L-NCSX-983-01 (ORIGINAL IN OPS CENTER)
Modular Coil Lift Procedure D-L-NCSX-984-00 (ORIGINAL IN OPS CENTER)
Finished Modular Coil Winding Form Lift Procedure D-L-NCSX-996-00 (ORIGINAL IN OPS CENTER)
Modular Repair Procedures

Modular Coil Lead Repair - Part 1 Exploration

D-NCSX-RP-STEL-057-00 (ORIGINAL IN OPS CENTER)

Modular Coil Lead Repair - Part 2 Repair D-NCSX-RO-STEL-058-00 (Draft in Review)
Modular Access Procedures

Personnel Access of the NCSX Autoclave

D-NCSX-OP-763-00 (ORIGINAL IN OPS CENTER)

 

Toroidal Field Coils Plans and Procedures

Title

Document Number

Toroidal Field Coil Plans

Toroidal Coil Manufacturing, Inspection, Test , and Quality Assurance Plan NCSX-MITQA-131-01-00  (Approved)
 

Field Period Assembly Plans and Procedures

Field Period Assembly Plans
Field Period Assembly Plan NCSX-PLAN-FPA-00-dA
Field Period Assembly Manufacturing, Inspection, Test , and Quality Assurance Plan NCSX-MIT/QA-185-01-00
Station 1 Field Period Assembly Sequence Plan

NCSX-PLAN-FPA1SEQ-00

Field Period Assembly Station 1 Dimensional Control Plan

NCSX-PLAN-FPA1DC-00

Field Period Assembly Procedures

Field Period Assembly Component Receipt Inspection D-NCSX-FPA-QA1-00 (ORIGINAL IN OPS CENTER)
Field Period Assembly Station One D-NCSX-FPA-001-00 (ORIGINAL IN OPS CENTER)

Field Period Assembly Lift Procedures

VVSA Lift Procedure D-L-NCSX-997-00 (ORIGINAL IN OPS CENTER)

NOTE:  Copies of Detailed Manufacturing Procedures (Run Procedures)  posted in this web are for convenience only - Original hard copy located in the PPPL Operations Center

 
 

Privacy and Security Notice

Please forward comments and questions to the bsimmons@pppl.gov