Review Title VVSA Product Spec Review
Date 08 April 2004
Cognizant Engineer Paul Goranson
Responsible Line Manager Wayne Reiersen
Review Board Chairperson John Schmidt
Review Board Members Heitzenroeder, Malinowski, Cole Dudek
Invited Attendees Nelson
Other Attendees Pitonak
Charge

Is the product spec consistent with the design-to requirements?

Does the product spec provide an adequate technical basis for manufacture?

Design Review Material

Announcement

VVSA Product Spec (as amended during the review)

Chits and Disposition Plan

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified
Development plans and schedules Not addressed
Regulatory compliance including USQD and NEPA Not addressed
Disposition of CHITS from previous reviews Not applicable
Cost objectives Not addressed

Other review objectives addressed

(Attachment 4 of ENG-033)

Not applicable

Summary of Results

Disposition

(check  one)

Acceptable
 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
Incomplete - Additional design work is required prior to another design review.