Engineering > Specifications > WBS 14 Specifications

Legend

 

 

No spec planned

ID

Drafted

ID

Approved

[Note]

See note below table

Please click on document identifier underlined in table below to access the spec...

 

WBS

Description

Development Specs

Product Specs

Spec Reviews

14

Modular Coils

NCSX-BSPEC-14-01

 

3/31/04 Spec Review

141

Winding Forms

 

 

Prototype Winding Form

 

NCSX-CSPEC-141-01-05

Twisted Racetrack  Winding Form

 

NCSX-CSPEC-141-02-00

Production Modular Coil Winding Forms   NCSX-CSPEC-141-03-13

142

Windings and Assembly

 

Winding Facility

Autoclave Systems

NCSX-BSPEC-142-01-00

 

Autoclave Pressure Vessel

 

NCSX-CSPEC-142-01-00

Autoclave Controls and Support Systems

 

NCSX-CSPEC-142-02-00

VPI and Molding Equipment

Modular Coil Conductor   NCSX-CSPEC-142-03-01
Twisted Racetrack Coil   NCSX-CSPEC-142-04-00
Modular Coil Assemblies (A/B/C)   NCSX-CSPEC-142-05-01
Plasma Spray Coating for MC Shims   NCSX-CSPEC-142-06-01
Plasma Spray Ceramic Coating for MC Prototype Shims   NCSX-CSPEC-142-07-01

143

Local I&C

 

Notes:

[1] The document governing Field Period Assembly activities is the Field Period Assembly Plan. Development specs are only planned for Tooling and Measurement Systems.

[2] Not required as part of MIE Project