NCSX Basis of Estimate 
(2007 Rebaseline) | 
      
    | WBS | Job | Job Title | 
      
        | 12 - Vacuum Vessel Systems | 1204 | Vacuum Vessel Procurements (Non-VVSA) | 
      
        | 
	13 - Conventional Coils | 
	1302/1352 | 
	PF Coil Design (1302) 
	PF Coil Procurements (1352) | 
      
        |  | 1353 | Central Solenoid Procurement | 
      
        |  | 1354 | Trim Coil Design & Procurement | 
      
        |  | 1355 | Conventional Coils I&C | 
      
        |  | 1361 | TF Coil Fabrication | 
      
        | 14 - Modular Coils | 1408/1451/1459 | 
	Modular Coil Winding Supplies (1408) 
	Modular Coil Winding Operations (1451) 
	Modular Coil Fabrication Punch List Items (1459) | 
      
        |  | 1416 | Modular Coil Type A&B Design | 
      
        |  | 1421 | Modular Coil Interface Design | 
      
        |  | 1431 | Modular Coil Interface Hardware | 
      
        | 15 - Coil Support Structures | 1501/1550 | 
	Coil Structures Design (1501) 
	Coil Structures Procurement (1550) | 
      
        | 16 - Coil Services | 
    
	1601-161 
	
	1601-162 
	
	1601-163 | 
	LN2 Distribution System (1601-161) 
	Coil Electrical Leads (1601-162) 
	Coil Protection System Interfaces (1601-163) | 
      
        | 17 - Cryostat & Base Support Structure | 1701/1751 | 
	Cryostat Design (1701) 
	Cryostat Procurements (1751) | 
      
        |  | 1702/1752 | 
	Base Support Structure Design (1702) 
	Base Support Structure Procurements (1752) | 
      
        | 18 - Field Period Assembly | 1802/1810/1815 | 
	FPA Oversight & Support (1802) 
	FPA Operations - Stations 1, 2 & 3 (1810) 
	FPA Operations - Station 5 (1815) | 
      
        |  | 1803/1805 | 
	FPA Tooling Design & Constructibility (1803) 
	FPA Hardware Procurements (1805) | 
      
        |  | 1806 | 
	FPA Specifications & Drawings  | 
      
        | 19 - Stellarator Core Mgmt & Integration | 1901 | 
	Stellarator Core Management & Integration | 
      
        | 21 - Fueling Systems | 2101 | 
	Gas Fueling Systems | 
      
        | 22 - Torus Vacuum Pumping Systems | 2202 | Vacuum Pumping Systems | 
      
        | 3 - Diagnostic Systems | 3101 | Magnetic Diagnostic Systems | 
      
        |  | 3601 | Edge & Divertor Diagnostic Systems | 
      
        |  | 3801 | Electron Beam Mapping Systems | 
      
        |  | 3901 | Diagnostic Integration | 
      
        | 
	4 - Electrical Power Systems | 
	
	4101 | 
	AC Power Systems | 
      
        |   | 
	
	4301 | 
	DC Power Systems | 
      
        |   | 
	
	4401 | 
	Control & Protection Systems | 
      
        |   | 
	
	4501 | 
	Power Systems Design & Integration | 
      
        | 
	5 - Central Controls and Computing | 
	5101 | 
	Network & Fiber Optic Infrastructure Systems | 
      
        |   | 
	
	5201 | 
	Central Instrumentation & Control Systems | 
      
        |   | 
	
	5301 | 
	Data Acquisition & Facility Computing Systems | 
      
        |   | 
	
	5401 | 
	Facility Timing & Synchronization Systems | 
      
        |   | 
	
	5501 | 
	Real Time Plasma Control Systems | 
      
        |   | 
	
	5601 | 
	Central Safety Interlock Systems | 
      
        |   | 
	
	5801 | 
	Central I&C Management & Integration | 
      
        | 6 - Facility Systems | 6101 | Cooling Water Systems | 
      
        |  | 6201 | Cryogenic Systems | 
      
        |  | 6301 | Utility Systems | 
      
        |  | 6401 | Bakeout Systems | 
      
        | 7 - Test Cell Prep & Machine Assembly | 7301 | Platform Design & Fabrication | 
      
        |  | 7401/7451 | Machine Assembly Planning & Oversight | 
      
        |   | 
	
	7501/7503 | 
	Construction Support (7501) 
	Machine Assembly Operations (7503) | 
      
        |   | 
	
	7601 | 
	Machine AssemblyTooling Design & Fabrication | 
      
        | 
	81 - Project Management & Integration | 
	
	
	8101/8102/8998 | 
	Project Management @ PPPL (8101) 
	Project Management @ ORNL (8102) 
	PPPL Direct Allocations (8998) | 
      
        | 
	82 - Project Engineering | 
	
	
	8202 | 
	Engineering Management & Systems Engineering | 
      
        |   | 
	
	8203 | 
	Design Integration | 
      
        |   | 
	8204 | 
	Systems Analysis & Technical Assurance | 
      
        |   | 
	
	8205 | 
	Dimensional Control Coordination | 
      
        |   | 
	
	8215 | 
	Plant Design | 
      
        | 
	85 - Integrated Systems Testing | 
	
	
	8501 | 
	Integrated Systems Testing |