NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Reviews > WBS 4 Design Reviews

Legend

 

Date

Conducted

Date

 Closed

[Note]

See note below table

Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

4

Electrical Power Systems

7/07/05  
  Coil Protection 2/22/08      

41

AC Power

42

AC/DC Converters

43

DC Systems

 
  D-site to C-site transmission tower PDR 2/17/04
  D to C Site DC Transmission System    

5/14/04

 

44

Control and Protection Systems

  RF Ground Plane Cutting in the NCSX TC 4/21/04      

45

Power System Design and Integration

46

FCPC Building Modifications

 

Privacy and Security Notice

Please forward comments and questions to the Webmaster