Review
Title |
Vacuum Vessel Thermal
Insulation FDR |
Date |
31 May 2006 |
Cognizant
Engineer |
Paul Goranson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Larry Dudek |
Review Board Members |
Larry Dudek, Tom Brown,
Hutch Neilson, Mike Zarnstorff, Brad Nelson |
Invitees |
Frank Malinowski, Mike Cole,
Mike Viola, Geoff Gettelfinger, Wayne Reiersen |
Attendees |
|
Charge |
1. |
Does the insulation
and boot seal design meet all performance requirements, and have all
safety issues associated with the loose fill insulation been
addressed? |
2. |
Do the insulation,
and boots satisfy envelope requirements? Are they compatible
with the MC shell, cooling tubes, magnetic loops, mounting hardware,
etc.? Can the insulation and boots be readily installed? |
3. |
Have potential
failure modes been adequately addressed in the design? |
4. |
Is the design
documentation required to procure, fabricate, and install the
insulation and boots adequate? |
|
Design Review Material |
Announcement
Chits and Disposition
Review Committee Report
|
Review Board Report |
 |
Items Reviewed |
 |
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
 |
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
 |

|
 |
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
 |
Disposition
(check
one) |
1 Acceptable |
1 Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |