Schedule of Presentations
Tuesday, April 8, 2008 — LSB318
|
8:00 a.m. |
DOE Executive Session
|
9:00 a.m. |
Plenary Session: Welcome/Overview A.J.S. Smith/ D. Christensen
|
9:10 a.m. |
Project Overview D. Rej PPT PDF
|
9:45 a.m. |
Engineering Design and Integration P. Heitzenroeder PPT PDF
|
10:30 a.m.
|
Break
|
10:45 a.m. |
Mechanical Construction and Assembly L. Dudek PDF
|
11:15 a.m. |
Laboratory Tours / Review Photo
Vacuum Vessel Preparation and Field Period Assembly—M. Viola
Modular Coil Fabrication—J. Chrzanowski
NCSX Site Preparation—E. Perry
|
12:30 p.m. |
Lunch
|
1:30 p.m.
|
Breakout Sessions
Session I: Stellarator Core Systems (Location: Directors' Conference Room LSB331)
WBS 12: Vacuum Vessel: Heater Control Nuetral Beam — P. Goranson
WBS 14: Modular Coils — J. Chrzanowski / M. Cole / L. Dudek PPT
WBS 13: Conventional Coils — M. Kalish/ Chrzanowski/ Dahlgren/ Cole PPT PDF
WBS 17: Cryostat Cryosystem — S. Raftopoulos
WBS 16: Coil Services — P. Goranson  PPT  
WBS 15: Coil Support Structures — F. Dahlgren   PPT  
Session II: Assembly, Test Cell Prep, Start-Up
(Location: LSB318)
WBS 18: Field Period Assembly — M. Viola / T. Brown / L. Dudek PPT
WBS 7: Test Cell Preparation & Machine Assembly — E. Perry   PPT
WBS 85: Integrated Systems Testing — A. von Halle   PPT
CD–4 Objectives — H. Neilson   PPT
Session III: Management
(Location: DOE Conference Room, 2nd Floor)
Cost, Schedule, Milestones — R. Strykowsky   PPT
Risk Based Contingency Analysis — C. Gruber   PPT
Staffing — D. Rej, J. Harris
Procurement — R. Templon
ES&H — J. Levine
QA — J. Malsbury
Management Initiatives — D. Rej
|
5:00 p.m.
|
Executive Session
(Location: LSB318)
|
6:30 p.m. |
Adjourn
|
7:00 p.m. |
Review Dinner Directions
|
Top
|
|
Wednesday, April 9
|
8:00 a.m.
|
Breakout Sessions
Session I: Ancillary Systems (Location: LSB318)
Vacuum Pumping and Gas Fueling — W. Blanchard PPT
Diagnostics — B. Stratton PPT PDF
Electrical Power Systems — R. Ramakrishnan PPT
Central Controls and Computing — P. Sichta PPT PDF
Facility Systems — L. Dudek
Cooling and Utilities PDF
Bakeout PPT
Session II: Integration & Systems Engineering
(Location: Directors' Conference Room LSB331)
Project Integration Overview — H. Neilson / P. Heitzenroeder PPT
Design Integration —T. Brown PPT
Plant Design — E. Perry PPT
System Analysis/Technical Assurance — A. Brooks PPT
Dimensional Control Coordination — R. Ellis PPT
Stellarator Core Management and Integration — M. Cole PPT PDF
System Engineering — R. Simmons PPT
Thursday, April 10 — LSB318
|
8:00 a.m.
|
DOE Executive Session
|
9:30 a.m.
|
DOE Closeout Dry Run
SC Project Review Presentation
PPT PDF
|
11:30 p.m.
|
Lunch
|
12:30 p.m.
|
Closeout Presentation / PPPL, ORNL, Princeton University Management
|
2:18 p.m.
|
Adjourn
|
Top
Updated: April 9
|
|