NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Statements of Work (SOWs)
Style InstructionsStyle instructions and a sample document following the prescribed style have been provided.
Format Requirements.  Format SOWs in accordance with the SOW Format Guidelines, patterned after MIL-STD-245.
Statements of Work
1 Stellarator Core Systems

12

Vacuum Vessel

121

Vacuum Vessel Sub-Assembly

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-121-01-02

SOW for Weld R&D NCSX-SOW-121-02-03-Signed
SOW for VVSA Production

NCSX-SOW-121-03-01-Signed

123 Coolant Tubes SOW for Coolant Tubes NCSX-SOW-123-01-00-Signed
13 Conventional Coils

131

TF Coils

SOW for TF Coil Conductor

NCSX-SOW-131-01-00

14

Modular Coils

141 

Winding Forms

SOW for Manufacturing Development and Prototype Fabrication

NCSX-SOW-141-01-06-Signed

SOW for Fabrication of the Production MCWFs

NCSX-SOW-141-02-04-Signed

142

Windings and Assembly

SOW for Winding Development Activities

NCSX-SOW-142-01-00

  SOW for Conductor Testing Activities  NCSX-SOW-142-02-00
    SOW for Modular Coils Conductor NCSX-SOW-142-03-00 -Signed
4 Electrical Power Systems
432 D- to C-site Systems SOW for Title II Design of the D- to C-Site DC Transmission System NCSX-SOW-432-01-00
7 Test Cell Preparation and Machine Assembly
75 Test Cell & Basement Assembly Operations SOW for NCSX 30T Crane Upgrade NCSX-SOW-75-01-00
 
 

Privacy and Security Notice

Please forward comments and questions to the  bsimmons@pppl.gov