Title |
Document Number |
Modular Coil Plans |
Modular Coil Manufacturing,
Inspection, Test , and Quality Assurance Plan |
NCSX-MITQA-142-00
|
Modular Coil Winding Dimensional
Control Plan |
NCSX-PLAN-MCWDC-00 |
Modular Coil
Manufacturing Procedures |
Modular Coil
Fabrication-Winding Form Preparation Activities |
D-NCSX-MCF-001-05
(ORIGINAL IN OPS CENTER)
|
Modular Coil
Fabrication-Winding Station Activities |
D-NCSX-MCF-002-03
(ORIGINAL IN OPS CENTER) |
Modular Coil
Fabrication-VPI/Autoclave Activities |
D-NCSX-MCF-003-04
(ORIGINAL IN OPS CENTER) |
|
D-NCSX-MCF-004-03
(ORIGINAL IN OPS CENTER) |
Dimensional Control and Metrology for the NCSX Modular Coils
|
D-NCSX-MCF-005-03
(ORIGINAL IN OPS CENTER) |
Modular Coil Punch List
Web Page |
Modular Coils Operating Procedures |
Modular Coil Manufacturing
Facility Autoclave Operating Procedure |
D-NCSX-OP-G-162-01
(ORIGINAL IN OPS CENTER) |
Modular Coil Emergency Response Procedures |
Modular Coil Manufacturing
Facility Emergency Response Procedure |
D-NCSX-OP-EO-41-00a
(ORIGINAL IN OPS CENTER) |
Modular Coil Lift Procedures |
Modular Coil Winding Form Lift Procedure |
D-L-NCSX-983-XX--OBTAIN THE LATEST VERSION FROM THE OPS CENTER |
Modular Coil Lift Procedure |
D-L-NCSX-984-XX--OBTAIN THE LATEST VERSION FROM THE OPS CENTER |
Finished Modular Coil Winding Form Lift Procedure |
D-L-NCSX-996-XX--OBTAIN THE LATEST VERSION FROM THE OPS CENTER |
Modular Repair Procedures |
Modular Coil Lead Repair - Part 1 Exploration |
D-NCSX-RP-STEL-057-00
(ORIGINAL IN OPS CENTER) |
Modular Coil Lead Repair - Part 2 Repair |
D-NCSX-RP-STEL-058-00
(ORIGINAL IN OPS CENTER) |
Modular Access Procedures |
Personnel Access of the NCSX Autoclave |
D-NCSX-OP-763-00
(ORIGINAL IN OPS CENTER) |
|
Toroidal Field Coils Plans and Procedures
|
Title |
Document Number |
Toroidal Field Coil Plans |
Toroidal Coil Manufacturing,
Inspection, Test , and Quality Assurance Plan |
NCSX-MITQA-131-01-00
(Approved) |
|
Field Period Assembly
Plans and Procedures
|
Field Period Assembly Plans |
Field Period Assembly Plan |
NCSX-PLAN-FPA-00-dA |
Field Period Assembly Manufacturing,
Inspection, Test , and Quality Assurance Plan |
NCSX-MITQA-185-01 |
Station 1 Field Period
Assembly Sequence Plan |
NCSX-PLAN-FPA1SEQ-00 |
Field Period Assembly Station 1
Dimensional
Control Plan |
NCSX-PLAN-FPA1DC-00
|
Field Period Assembly Station 2
Dimensional
Control Plan |
NCSX-PLAN-FPA2DC-00
|
Field Period Assembly Station 3
Dimensional
Control Plan |
NCSX-PLAN-FPA3DC-00 |
Sequence Assembly Plans
(Stations 2 First Article, Station 2 Production, Station 3, Station 5, &
Station 6) |
Sequence Plan (Rev 10-0) |
Field
Period Assembly Procedures |
Field Period Assembly
Component Receipt Inspection |
D-NCSX-FPA-QA1-00
(ORIGINAL IN OPS CENTER) |
Field Period Assembly Station
One |
D-NCSX-FPA-001-01
(ORIGINAL IN OPS CENTER)
- Revisions 2 & 3
are signed, but not posted because ~80% of work
done to this version. Both are vailable upon request.
|
Field Period Assembly Station
Two |
D-NCSX-FPA-002-00
(ORIGINAL IN OPS CENTER) |
Field Period Assembly Station
Three |
D-NCSX-FPA-003-00
(ORIGINAL IN OPS CENTER) |
Station Three Lift Lift
Review (Collins Engineering - 5/29/2008)) |
Review of D-L-NCSX-1000 |
Metrology for Field Period
Assembly (FPA) |
D-NCSX-FPA-010-00
(ORIGINAL IN OPS CENTER) |
Field Period Assembly Lift Procedures |
VVSA Lift Procedure |
D-L-NCSX-997-XX--OBTAIN THE
LATEST VERSION FROM THE OPS CENTER |
NCSX Coil Test Procedures |
Generic Electrical
Test Procedure for NCSX Coils |
D-NCSX-PTP-CL-040
(ORIGINAL IN OPS CENTER) |