April [26]

May [15 23 30]

June [11 20 27] Project meeting (6/11)

July [11 18 24] Project meeting (7/24)

August [1 8 15 22 28Mfg information meeting (8/22)

September [12 19 26]

October [3 5 9 10 11 16 18 23 25 30 31]

Project meeting (10/16), Kick-off (10/5), WBS 1 (10/9), WBS 2 (10/11), WBS 3 (10/18), WBS 4 (10/23), WBS 5 (10/25), WBS 6 (10/30)

November [7 14 21 30a 30b

PAC-5 meeting (11/14-15), Coil cooling (11/30a), Coil design (11/30b)