NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Analysis Reports

Analysis reports are filed by WBS element.  Please click on the appropriate WBS identifier (WBS ID) below to view a list of analysis reports in that area.

 

Click here for guidelines for documenting analyses.

WBS ID WBS Description
1 Stellarator Core Systems
11 Plasma Facing Components
12 Vacuum Vessel Systems
131 TF Coils
132 PF Coils
133 External Trim Coils
14 Modular Coils
15 Coil Support Structures
16 Coil Services
17 Cryostat and Base Support Structure
18 Field Period Assembly
19 Stellarator Core Management and Integration
2 Auxiliary Systems
3 Diagnostics
4 Electrical Power Systems
5 Central I&C Systems
6 Facility Systems
7 Test Cell Preparation and Machine Assembly
8 Project Oversight and Support
82 Project Engineering

Privacy and Security Notice

Please forward comments and questions to the Webmaster