Potential Interfaces
(WBS / WBS) |
Lead Engineer |
ICD # |
Purpose |
Status of Documenting
Interfaces |
WBS 12 Interfaces |
|
|
|
12
to13 |
Goranson |
|
|
Interfaces covered in
top level model (SE-100-002) |
121 to 142 |
Goranson |
ICD-121-142-0001-00
|
Defines clearance
requirements between the VVSA and Modular Coils & the radial
buildups allotted to other VVSA external components |
|
12 to 14 to 3 |
|
ICD-12-14-3-0001-01 |
Defines the requirements
for mounting the protective insulation between the VV and Modular
Coils & the required clearances |
In signature cycle |
12-15 |
|
|
|
Interfaces covered in
top level model (SE-100-002) |
125 to 171
to 4 to 5 |
Goranson |
ICD-125-171-4-5-0001-01 |
Defines the location and
mounting provisions for the tube penetrations through the Cryostat |
|
12 to 18 |
Goranson |
|
Metrology interfaces |
Metrology points defined by MTM as part of contract |
12 to 21
to 23 |
Goranson |
|
|
NOT IN MIE PROJECT, but port allocation drawing shows provisions for
future addition |
12 to 24 |
Goranson |
|
|
NOT IN MIE PROJECT, but port allocation drawing shows provisions for
future addition |
12 to 25 |
Goranson |
|
|
NOT IN MIE PROJECT, but port allocation drawing shows provisions for
future addition |
12 to 3 |
Goranson |
ICD-12-3-0001-01
|
References the port
locations, allocations for diagnostics & the Port
maximum loads |
|
12 to 4 |
Goranson |
ICD-12-4-0001-00 |
Defines the VV grounding requirements and
describes the interface connection to NCSX grounding system. |
|
12 to 7 |
Goranson |
|
Metrology interfaces |
Metrology points defined by MTM as part of contract |
123 to 3
|
Stratton |
ICD-123-3-0001-00 |
Defines the initial
requirements and design of the saddle loops |
|
123 to 4 to 5 |
Goranson |
ICD-123-4-5-0001-01 |
Defines the requirements
for the resistance heaters and the interfaces. |
|
123 to 64 |
Goranson |
ICD-123-64-0001-01 |
Defines the operational
parameters for the pressurized helium supplied by WBS 64 and defines
the hookup requirements |
|