NCSX Basis of Estimate
(2008 Rebaseline)
Status Date: March 24, 2008
Key:
|
WBS |
Job |
Rev/Date |
Job Title |
|
12 - Vacuum Vessel Systems |
1204
1260
1270 |
Rev
7/Mar 3
Rev 4/Mar 19
Rev 1/Feb 27
|
Vacuum Vessel Procurements (Non-VVSA)
Neutral Beam Transition Ducts
Heater Control System |
Goranson
Goranson
Gernhardt |
13 - Conventional Coils |
1302
1352 |
Rev 7/Mar 7 |
PF Coil Design
PF Coil Procurements |
Chrzanowski
Chrzanowski |
|
1353 |
Rev 9a/Mar 20 |
Central Solenoid Structure Procurement |
Dahlgren |
|
1354 |
Rev 4/Mar 3 |
Trim Coil Design & Procurement |
Kalish |
|
1355 |
Rev 8/Mar 24 |
Conventional Coils I&C |
Cole |
|
1361 |
Rev 5/Mar 3 |
TF Coil Fabrication |
Kalish/Meighan |
14 - Modular Coils |
1408
1451
1459 |
Rev 11/Mar 10 |
Modular Coil Winding Supplies
Modular Coil Winding Operations
Modular Coil Fabrication Punch List Items |
Chrzanowski
Chrzanowski
Chrzanowski |
|
1416 |
Rev 5/Mar 3 |
Modular Coil Type A&B Design |
Cole |
|
1421 |
Rev 6/Feb 23 |
Modular Coil Interface Design |
Cole |
|
1431 |
Rev 9/Mar 3 |
Modular Coil Interface Hardware |
Dudek |
15 - Coil Support Structures |
1501
1550 |
Rev 12a/Mar 20 |
Coil Structures Design
Coil Structures Procurement |
Dahlgren
Dahlgren |
16 - Coil Services |
1601-161
1601-162
1601-163 |
Rev 9a/Mar 19
Rev 10a/Mar 19
Rev 4/Feb 21 |
LN2 Distribution System
Coil Electrical Leads
Coil Protection System Interfaces |
Goranson
Goranson
Goranson |
17 - Cryostat & Base Support Structure |
1701
1751 |
Rev 5/Mar 21 |
Cryostat Design
Cryostat Procurements |
Raftopoulos
Raftopoulos |
|
1702
1752 |
Rev 4a/Mar 20 |
Base Support Structure Design
Base Support Structure Procurements |
Dahlgren
Dahlgren |
18 - Field Period Assembly |
1802
1810
1815 |
Rev 22/Mar 8 |
FPA Oversight & Support
FPA Operations - Stations 1, 2 & 3
FPA Operations - Station 5 |
Viola
Viola
Viola |
|
1803
1805 |
Rev 7/Feb 29 |
FPA Tooling Design & Constructability
FPA Hardware Procurements (1805) |
Brown
Dudek |
|
1806 |
Rev 7/Feb 23 |
FPA Specifications & Drawings |
Cole |
19 - Stellarator Core Mgmt & Integration |
1901 |
Rev 6/Mar 5 |
Stellarator Core Management & Integration |
Cole |
21 - Fueling Systems |
2101 |
Rev 9/Mar 19 |
Gas Fueling Systems |
Blanchard |
22 - Torus Vacuum Pumping Systems |
2201 |
Rev 9/Mar 19 |
Vacuum Pumping Systems |
Blanchard |
3 - Diagnostic Systems |
3101 |
Rev 8/Mar 1 |
Magnetic Diagnostic Systems |
Stratton |
|
3601 |
Rev 5/Mar 1 |
Edge & Divertor Diagnostic Systems |
Stratton |
|
3801 |
Rev 5/Mar 1 |
Electron Beam Mapping Systems |
Stratton |
|
3901 |
Rev 6/Mar 1 |
Diagnostic Integration |
Stratton |
4 - Electrical Power Systems |
4101 |
Rev 2/Feb 23 |
AC Power Systems |
Ramakrishnan |
|
4301 |
Rev 3/Mar 18 |
DC Power Systems |
Ramakrishnan |
|
4401 |
Rev 6/Mar 18 |
Control & Protection Systems |
Ramakrishnan |
|
4501 |
Rev 5/Feb 23 |
Power Systems Design & Integration |
Ramakrishnan |
5 - Central Controls and Computing |
5101 |
Rev 7/Mar 1 |
Network & Fiber Optic Infrastructure Systems |
Sichta |
|
5201 |
Rev 6/Mar 1 |
Central Instrumentation & Control Systems |
Sichta |
|
5301 |
Rev 6/Mar 1 |
Data Acquisition & Facility Computing Systems |
Sichta |
|
5401 |
Rev 5/Mar 1 |
Facility Timing & Synchronization Systems |
Sichta |
|
5501 |
Rev 6/Mar 1 |
Real Time Plasma Control Systems |
Sichta |
|
5601 |
Rev 8/Mar 1 |
Central Safety Interlock Systems |
Sichta |
|
5801 |
Rev 5/Mar 1 |
Central I&C Management & Integration |
Sichta |
6 - Facility Systems |
6101 |
Rev 4/Feb 29 |
Cooling Water Systems |
Dudek |
|
6201 |
Rev 9/Mar 21 |
Cryogenic Systems |
Raftopoulos |
|
6301 |
Rev 3/Feb 29 |
Utility Systems |
Dudek |
|
6401 |
Rev 4/Mar 3 |
Bakeout Systems |
Kalish |
7 - Test Cell Prep & Machine Assembly |
7301 |
Rev 6/Feb 29 |
Platform Design & Fabrication |
Perry |
|
7401/7451 |
Rev 10/Mar 6 |
Machine Assembly Planning & Oversight |
Perry |
|
7501
7503 |
Rev 9/Mar 9 |
Construction Support
Machine Assembly Operations |
Perry
Perry |
|
7601 |
Rev 3/Feb 29 |
Machine AssyTooling Dsn& Fab |
Perry |
81 - Project Management & Integration |
8101
8102
8998 |
Rev 14/Mar 21 |
Project Management @ PPPL
Project Management @ ORNL (
PPPL Direct Allocations
|
Rej
Harris
Strykowski |
82 - Project Engineering |
8202 |
Rev 7/Mar 7 |
Engineering Management & Systems Engineering |
Heitzenroeder |
|
8203 |
Rev 5/Feb 29 |
Design Integration |
Brown |
|
8204 |
Rev 4/Mar 1 |
Systems Analysis & Technical Assurance |
Brooks |
|
8205 |
Rev 4/Feb 29 |
Dimensional Control Coordination |
Ellis |
|
8215 |
Rev 4/Mar 3 |
Plant Design |
Perry |
85 - Integrated Systems Testing |
8501 |
Rev 4/Mar 3 |
Integrated Systems Testing |
Gentile |