NCSX Basis of Estimate

(2008 Rebaseline)       Status Date: March 24, 2008

 

Key: 

WBS Job Rev/Date  Job Title  
12 - Vacuum Vessel Systems 1204
1260

1270
Rev 7/Mar 3
Rev 4/Mar 19
Rev 1/Feb 27
Vacuum Vessel Procurements (Non-VVSA)
Neutral Beam Transition Ducts
Heater Control System
Goranson
Goranson
Gernhardt

13 - Conventional Coils

1302
1352
Rev 7/Mar 7

PF Coil Design

PF Coil Procurements

Chrzanowski
Chrzanowski
  1353 Rev 9a/Mar 20 Central Solenoid Structure Procurement Dahlgren
  1354 Rev 4/Mar 3 Trim Coil Design & Procurement Kalish
  1355 Rev 8/Mar 24 Conventional Coils I&C Cole
  1361 Rev 5/Mar 3 TF Coil Fabrication Kalish/Meighan
14 - Modular Coils 1408
1451
1459
Rev 11/Mar 10

Modular Coil Winding Supplies

Modular Coil Winding Operations

Modular Coil Fabrication Punch List Items

Chrzanowski
Chrzanowski
Chrzanowski
  1416 Rev 5/Mar 3 Modular Coil Type A&B Design Cole
  1421 Rev 6/Feb 23 Modular Coil Interface Design Cole
  1431 Rev 9/Mar 3 Modular Coil Interface Hardware Dudek
15 - Coil Support Structures 1501
1550
Rev 12a/Mar 20

Coil Structures Design

Coil Structures Procurement

Dahlgren
Dahlgren
16 - Coil Services 1601-161
1601-162
1601-163

Rev 9a/Mar 19
Rev 10a/Mar 19
Rev 4/Feb 21

LN2 Distribution System

Coil Electrical Leads

Coil Protection System Interfaces

Goranson
Goranson
Goranson
17 - Cryostat & Base Support Structure 1701
1751
Rev 5/Mar 21

Cryostat Design

Cryostat Procurements

Raftopoulos
Raftopoulos
  1702
1752
Rev 4a/Mar 20

Base Support Structure Design

Base Support Structure Procurements

Dahlgren
Dahlgren
18 - Field Period Assembly 1802
1810
1815
Rev 22/Mar 8

 

FPA Oversight & Support

FPA Operations - Stations 1, 2 & 3

FPA Operations - Station 5

Viola
Viola
Viola
  1803
1805
Rev 7/Feb 29

FPA Tooling Design & Constructability
FPA Hardware Procurements (1805)

Brown
Dudek
  1806 Rev 7/Feb 23

FPA Specifications & Drawings

Cole
19 - Stellarator Core Mgmt & Integration 1901 Rev 6/Mar 5

Stellarator Core Management & Integration

Cole
21 - Fueling Systems 2101 Rev 9/Mar 19

Gas Fueling Systems

Blanchard
22 - Torus Vacuum Pumping Systems 2201 Rev 9/Mar 19 Vacuum Pumping Systems Blanchard
3 - Diagnostic Systems 3101 Rev 8/Mar 1 Magnetic Diagnostic Systems Stratton
  3601 Rev 5/Mar 1 Edge & Divertor Diagnostic Systems Stratton
  3801 Rev 5/Mar 1 Electron Beam Mapping Systems Stratton
  3901 Rev 6/Mar 1 Diagnostic Integration Stratton

4 - Electrical Power Systems

4101

Rev 2/Feb 23

AC Power Systems

Ramakrishnan

 

4301

Rev 3/Mar 18

DC Power Systems

Ramakrishnan

 

4401

Rev 6/Mar 18

Control & Protection Systems

Ramakrishnan

 

4501

Rev 5/Feb 23

Power Systems Design & Integration

Ramakrishnan

5 - Central Controls and Computing

5101

Rev 7/Mar 1

Network & Fiber Optic Infrastructure Systems

Sichta

 

5201

Rev 6/Mar 1

Central Instrumentation & Control Systems

Sichta

 

5301

Rev 6/Mar 1

Data Acquisition & Facility Computing Systems

Sichta

 

5401

Rev 5/Mar 1

Facility Timing & Synchronization Systems

Sichta

 

5501

Rev 6/Mar 1

Real Time Plasma Control Systems

Sichta

 

5601

Rev 8/Mar 1

Central Safety Interlock Systems

Sichta

 

5801

Rev 5/Mar 1

Central I&C Management & Integration

Sichta
6 - Facility Systems 6101 Rev 4/Feb 29 Cooling Water Systems Dudek
  6201 Rev 9/Mar 21 Cryogenic Systems Raftopoulos
  6301 Rev 3/Feb 29 Utility Systems Dudek
  6401 Rev 4/Mar 3 Bakeout Systems Kalish
7 - Test Cell Prep & Machine Assembly 7301 Rev 6/Feb 29 Platform Design & Fabrication Perry
  7401/7451 Rev 10/Mar 6 Machine Assembly Planning & Oversight Perry

 

7501
7503

Rev 9/Mar 9

Construction Support

Machine Assembly Operations

Perry
Perry

 

7601

Rev 3/Feb 29

Machine AssyTooling Dsn& Fab

Perry

81 - Project Management & Integration

8101
8102
8998

Rev 14/Mar 21

 

Project Management @ PPPL

Project Management @ ORNL (

PPPL Direct Allocations

Rej
Harris
Strykowski

82 - Project Engineering

8202 Rev 7/Mar 7

Engineering Management & Systems Engineering

Heitzenroeder

 

8203

Rev 5/Feb 29

Design Integration

Brown

 

8204

Rev 4/Mar 1

Systems Analysis & Technical Assurance

Brooks

 

8205

Rev 4/Feb 29

Dimensional Control Coordination

Ellis

 

8215

Rev 4/Mar 3

Plant Design

Perry

85 - Integrated Systems Testing

8501

Rev 4/Mar 3

Integrated Systems Testing

Gentile